BID/PROPOSAL
<br />CITY OF SOUTH BEND
<br />Project Name: Michi an Street Reconstruction ,may
<br />Ica
<br />Project Number: 118-075
<br />For Bids Due: 5/14/2019
<br />Contractor Name: Walsh & Kelly, Inc. a
<br />No.
<br />Description
<br />CITY
<br />UNIT
<br />UNIT PRICE
<br />AMOUNT
<br />1
<br />MOBILIZATION AND DEMOBILIZATION
<br />1
<br />LS
<br />161,000.00
<br />$161,000.00
<br />2
<br />MAINTAINING TRAFFIC
<br />1
<br />LS
<br />47,773.61
<br />$47,773.61
<br />3
<br />CONSTRUCTION ENGINEERING
<br />1
<br />LS
<br />43,200.00
<br />$43,200.00
<br />4
<br />CPM SCHEDULE
<br />1
<br />LS
<br />12,500.00
<br />$12,500.00
<br />5
<br />CPM SCHEDULE, MONTHLY UPDATE
<br />4
<br />EACH
<br />500.00
<br />$2,000.00
<br />6
<br />VIDEO RECORD
<br />1
<br />LS
<br />1,800.00
<br />$1,800.00
<br />7
<br />CLEARING RIGHT-OF-WAY
<br />1
<br />LS
<br />131,000.00
<br />$131,000.00
<br />8
<br />COMMON EXCAVATION, UNDISTRIBUTED
<br />200
<br />CYS
<br />39.00
<br />$7,800.00
<br />9
<br />SURFACE MILLING, ASPHALT, 1 1/2 IN +
<br />600
<br />SYS
<br />11.00
<br />$6,600.00
<br />10
<br />PAVEMENT REMOVE
<br />7115
<br />SYS
<br />12.00
<br />$85,380.00'
<br />11
<br />SIDEWALK, CONCRETE, REMOVE
<br />2060
<br />SYS
<br />11.00
<br />$22,660.00
<br />12
<br />CURB RAMP, CONCRETE, REMOVE
<br />93
<br />SYS
<br />25.00
<br />$2,325.00
<br />13
<br />CURB & GUTTER, CONCRETE, REMOVE
<br />615
<br />LFT
<br />12.00
<br />$7,380.00
<br />14
<br />CONCRETE HEADER, REMOVE
<br />1235
<br />LFT
<br />6.00
<br />$7,410.00
<br />15
<br />PLANTER WALL REMOVAL
<br />115
<br />LFT
<br />41.00
<br />$4,715.00
<br />16
<br />REMOVE EXIST PAVEMENT STRIPING
<br />3580
<br />LFT
<br />0.95
<br />$3,401.00
<br />17
<br />TREE REMOVE
<br />15
<br />EACH
<br />590.00
<br />$8,850.00
<br />18
<br />TEMPORARY EROSION CONTROL
<br />1
<br />LS
<br />4,200.00
<br />$4,200.00
<br />19
<br />TEMPORARY INLET PROTECTION
<br />41
<br />EACH
<br />105.00
<br />$4,305.00
<br />20
<br />TEMPORARY SLOT DRAIN PROTECTION
<br />1495
<br />LFT
<br />6.10
<br />$9,119.50
<br />21
<br />HANDHOLE, ADJUST TO GRADE
<br />46
<br />EACH
<br />350.00
<br />$16,100.00
<br />22
<br />MANHOLE LID REPLACEMENT
<br />2
<br />EACH
<br />1,200.00
<br />$2,400.00'
<br />23
<br />STORM CASTING REPLACEMENT
<br />2
<br />EACH
<br />1,200.00
<br />$2,400.00
<br />24
<br />PVC STORM PIPE, 12 IN
<br />90
<br />LFT
<br />58.00
<br />$5,220.00
<br />25
<br />TRENCH DRAIN, REMOVE AND REPLACE
<br />22
<br />LFT
<br />514.00
<br />$11,308.00
<br />26
<br />DI WATER MAIN, 6 IN
<br />31
<br />LFT
<br />375.00
<br />$11,625.00
<br />27
<br />REMOVE AND RESET FIRE HYDRANT
<br />1
<br />EACH
<br />5.300.00
<br />$5,300.00
<br />28
<br />PARTIAL DEPTH CONCRETE GUTTER SURFACE
<br />400
<br />LFT
<br />57.00
<br />$22,800.00
<br />REPLACEMENT
<br />29
<br />HMA PATCHING, TYPE B, UNDISTRIBUTED
<br />80
<br />TON
<br />175.00
<br />$14,000.00
<br />30
<br />COMPACTED AGGREGATE, NO. 53
<br />2560
<br />TON
<br />26.00
<br />$66,560.00
<br />
|