Laserfiche WebLink
B. Additions: <br />The obligation to perform under the terms of this Agreement may be terminated by an <br />official of the Department of Public Works, with approval from the Board of Public Works, <br />with or without cause, upon fourteen (14) calendar days written notice to the Contractor. <br />This Agreement may be terminated by Contractor upon fourteen (14) calendar days <br />written notice to the Department of Public Works in the event of substantial failure of <br />Public Works employees and agents to perform in accordance with the terms hereof. If <br />an official of the Public Works Department terminates the Contract for any cause, it shall <br />deduct from whatever is owed from the Contractor on the Contact or any other contract, <br />any amount sufficient to compensate the City of South Bend for any damages suffered by <br />it, including but not limited to, the cost difference in the materials between the primary <br />and secondary bidder because of the Contractor's wrongdoing. <br />V. RETAINAGE AND FINAL PAYMENT <br />A. Prevailing Specification s/I N DOT Standard Specifications Section: 109 <br />B. Additions: <br />1. Payments will be made every thirty (30) calendar days. <br />2. There will be NO Retainage. <br />3. Contractor shall invoice using the same nomenclature as specified in the bid proposal for <br />all items. <br />VI, CORRECTIVE ACTION/DAMAGES <br />A. Prevailing Specifications: None <br />B. Additions: <br />1. Failure to deliver concrete or asphalt materials within NINETY (90) minutes time of <br />scheduled delivery will result in damages charged to the supplier in the amount of time plus <br />expenses plus overhead charged. <br />2. The corrective action/damages are set forth as follows: <br />a. The damages will be for all of the specific mix design/material delivered on the <br />day the sample was taken. <br />b. Damages are progressive for each specific mix design. The material costs for the <br />day the sample was taken will be reduced by the following percentages <br />First test failure — 10% reduction of actual material cost. <br />ii. Second test failure — 20% reduction of actual material cost. <br />iii. Third test failure — 30% reduction of actual material cost. <br />iv. Fourth and all successive test failures — 50% of reduction of actual <br />material cost. <br />