Laserfiche WebLink
1. Total amount of contract not to exceed $20,000. <br />a. Cost per lawn mowed to equal $30.00 <br />b. Cost for Erskine Golf Course fence line will be $300 <br />2. City and contractor will agree on terms for additional charges for removal of <br />excess trash or other debris. <br />3. Contractor shall mow turf areas: <br />a. Every 14 calendar days AND <br />b. As needed according to seasonal growth or recent treatments applied so <br />that turf areas do not grow in excess of six (inches). <br />c. The City reserves the right to change the frequency based on the weather <br />conditions, length of the grass, or special need, and will be provided (48) <br />hours advance notice in event of additional mowing required. <br />d. Mowing schedule will be from the first day in June, 2018 through the last <br />day in August, 2018. <br />4. All areas will be finish mowed at three (3) inches in height. Areas where large <br />riding mowers are not feasible must be mowed with push mowers. Area to be <br />mowed include turf areas on parcel as well as turf areas between edge of road <br />and property line. <br />5. Mowing shall be with a rotary mower. Mower blades will be sharp at all times <br />to provide a quality cut. <br />6. Grass trimming must be performed around all poles, trees, sings, and along <br />fence areas. <br />7. Edging must be performed along sidewalks and curbs. Edging can be performed <br />with weed trimmer or edger. <br />8. Contractor shall mulch clippings into the lawn whenever conditions allow as <br />long as no readily visible clumps remain on the grass surface 24 hours after <br />mowing. Otherwise, Contractor shall distribute clumps of grass by mechanical <br />blowing or by collecting and removing them. Mulched clippings shall not be left <br />on sidewalks or streets. <br />