My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 12 - Erskine Clubhouse Renovation Project No 116-108 - Ziolkowski Construction Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 12 - Erskine Clubhouse Renovation Project No 116-108 - Ziolkowski Construction Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:52:20 PM
Creation date
5/15/2019 3:25:45 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/14/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INTER -OFFICE MEMORANDUM <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />TO: Linda M. Martin, Clerk <br />Board of Public Works <br />FROM: Kyle Silveus <br />SUBJECT: Change Order No. 12 <br />DATE: May 7, 2019 <br />nw.errie uaraour 2avxr:r: mn.w.r: n rrrcuvra a.r rwr.rammrua wramauutmu rra,oeaaex;uiwwrro s:nm a munwr:� rtdun¢�wa m ikraAm!awrcmimsropdarcnrwvra mvrmsrp-vusro :.nrnve :xrc reerurrir rmw <br />Erskine Clubhouse building located at 4200 Miami Street is a currently being renovated. Interior <br />repairs include new HVAC systems, plumbing and electrical systems, restroom upgrades, <br />interior finish upgrades, walls and ceilings. Exterior repairs and site improvements include a <br />new concrete ramp, window and door upgrades, replacement of the north porch slab, gutter <br />repair, exterior trim repairs, a new roof and a modification of the cart path layout. <br />The project has encountered numerous unforeseen conditions that were not reasonably <br />foreseen during the design phase and is going beyond 20% of the contract value. Items include <br />the discovery of lead paint on the concrete floor below existing carpet in the basement, asbestos <br />in the adhesive of VCT in the main area of the clubhouse (below carpet), and most recently the <br />discovery of two Underground storage tanks containing gasoline and fuel oil. <br />There have also been several items that were added to the project. Some items were identified <br />after the project was bid that made sense to include in the current project. <br />With the latest change order that includes Fuel Tank and Oil tank underground storage fuel <br />removal, wood floor repair, and exterior concrete stair replacement (Severely deteriorated <br />concrete hidden by carpet and thin overlay), 11.4% of change orders resulted in unforeseen <br />conditions and 10% resulted in "extras" or items that could arguably have been foreseen during <br />the design phase. Engineering requests the approval of Change Order 12, for $9,811.00 that <br />will increase the total of unforeseeable and foreseeable percentage of change orders at it relates <br />to the contract value to 21.43%. <br />Please call with your questions. <br />