My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 5 - Fire Station No 9 Project No 116-012 - Ziolkowski Construction Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 5 - Fire Station No 9 Project No 116-012 - Ziolkowski Construction Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:59:54 PM
Creation date
5/15/2019 3:24:20 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/14/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Fire Station #9 <br />ARCHITECTURE + PLANNING <br />November 9, 2018 <br />Project No.: 116-012 Issued Date: 11/9/18 <br />Project Name: Fire Station #9 No_ of Pages: 6 <br />Owner: Board of Public Works, City of South Bend <br />Architect: EPOCH Architecture + Planning <br />This is not a change directive to scope of work. Contractor to provide costs associated with the <br />proposed changes for owner consideration. <br />Item Number 1: <br />Provide credit to owner for selected removal of truck fill line according to ASI #9, attached. This <br />reduction is approximately 72' of 2" piping, three elbows, two tees and one shut-off valve. <br />Attachments: <br />M.M 1 1 - <br />116-012 / 17C037 Page 11 PR #009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.