My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 5 - Fire Station No 9 Project No 116-012 - Ziolkowski Construction Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 5 - Fire Station No 9 Project No 116-012 - Ziolkowski Construction Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:59:54 PM
Creation date
5/15/2019 3:24:20 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/14/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
X.y,ARt Mld 4'Sl <br />a,. <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />Project Number: 1 16-012 Project Name: Fire Station #9 Change Order #: 5 <br />DATE INITIATED:5-1-19 � �BPW DATE:5-14-19 <br />Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). <br />14 day time extension for winter weather delays; Credit for removing truck fill line and add to <br />provide and install duct. <br />Attachments: (List documents support change - required) <br />AIA G701 <br />Amount of ❑ Increase / iRDecrease: $ 553.00 <br />Categories (Pick One): <br />Previously approved Change Order(s): $.•-7, 398.00 ® Scope of Work <br />.. ----- ................... - ❑ Differing Site Conditions, Changed Conditions <br />Current Percent of Change: -0.02 __ __ <br />❑ Conflicted Specifications and Drawings <br />— <br />❑ Failed Materials <br />New Total Amount: $ 3,644,549.00 <br />❑ Error <br />. ........ w.W_. <br />❑ Omission <br />Total Percent of Change: -0.22 <br />❑ Final Quantity Adjustment <br />Funding Secured From: <br />(filled out by PM) <br />RECOMMENDED BY: <br />Project Inspector (Print Name) (Signature) (Date) <br />REVIEWED BY: <br />119 <br />......: <br />Construction M g r (Print Name) (Signature) (Date) <br />APPROVED BY: <br />Engineering Project Manager (Print Name) (Signature) (Date) <br />APPROVED BY: <br />City Engineer (Print Name) (Statre) (Date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.