My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Quote - Lafayette Building Drain Replacement Project No 119-042A - Niezgodski Plumbing Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Award Quotations/Proposals
>
Award Quote - Lafayette Building Drain Replacement Project No 119-042A - Niezgodski Plumbing Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 10:10:02 AM
Creation date
5/15/2019 3:15:40 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
5/14/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROJECT NAME: Lafa ettr�e Buiidi Draur R+ la + mer t <br />PROJECT NO. 119-042A <br />QUOTES DUE Aril 23, 2019, 9:30am, Local Time <br />(Must be completed for all quotes. Please type or print) <br />Date: Firm: IM G�..oc► ki.�h/) in <br />n c <br />Address: oaoL <br />City/State/Zip: Telephone Number: (51N ) oZ_43 - i 7 7 y <br />Agent of Bidder (if Applicable): <br />Pursuant to notices given, the unders <br />public works project of: <br />offers to furni H labor and/or material necessary to complete the <br />he C� of Sou rplans t p �prepared mm� t ty Ben�Indianalaccordance with ands specifications by: <br />The Ci ty of South Bend, Department of Public Works <br />and <br />dated __ . for the sum of (enter the Total Quote as shown on the Proposal) <br />r Enter Su �a �It;rC) Stdrn ($ _�7. [27. o 0 <br />( m of Total Quote shown on Proposal) (Numerical) <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any <br />addendums attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that shown <br />in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the <br />itemization of the units shall be shown on a separate attachment. <br />The above quote is accepted this _ <br />Subject to the following conditions: <br />ura L. O'Sulliw an, Member <br />w <br />ACCEPTANCE <br />Genevieve E. Miller, Member <br />Th r J. Dorau, MMb e <br />.; <br />Mesh: Linda M. Martin, CI r <br />Version 4/2/2019 Page - 7 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.