My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 2 to PSA - Arcadis US Inc - WWTP Stress Testing Evaluation
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Amendment No 2 to PSA - Arcadis US Inc - WWTP Stress Testing Evaluation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 1:19:49 PM
Creation date
5/15/2019 3:05:39 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
5/14/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STANDARD AGREEMENT FOR PROFESSIONAL SERVICES Page 2 of 3 <br />Between City of South Bend and ARCADIS U.S., Inc. Project Number: 03029041.0000 <br />_. __......__. ...._..._ ...._ _ <br />AMENDMENT No. 2 <br />Schedule A-2 <br />Scope of Amended Services and Related Matters <br />ENGINEERING SERVICES BY ARCADIS <br />Disinfection Pilot Testing: Arcadis will continue to perform a disinfection pilot test to determine the effectiveness of using <br />10 to 15 minutes of chlorine contact time in the existing chlorine contact tanks to achieve current microorganism kill permit <br />limits. Three additional full scale and three additional bench scale pilot tests will be performed during typical peak wet <br />weather flows. The intent is to perform the tests during a sustained 77 mgd peak flow event or close to it. Arcadis will <br />work closely with the City to coordinate the time and date of the pilot tests. Arcadis will use the previously developed pilot <br />testing protocol. Arcadis will provide the colorimeter, jar testing apparatus, sodium hypochlorite, and other equipment <br />necessary to perform the bench scale pilot tests. <br />The goals of the additional disinfection pilot testing are: <br />• Perform three full scale pilot tests in the existing chlorine contact tanks using wet weather secondary effluent. <br />• Perform three bench scale desktop pilot tests in the lab using wet weather secondary effluent. <br />• Evaluate the effectiveness of less than 15 minutes of contact time in terms of (i) microorganism kill and (ii) <br />chlorine concentration. Document the results for potential future use in IDEM discussions. <br />In addition, Arcadis will analyze the most recent 5-years of MRO data and summarize the available influent ammonia into <br />the chlorine contact tanks, and final effluent ammonia and TSS concentrations during wet weather and dry weather events. <br />This is important because ammonia and TSS concentrations can impact disinfection. To date, the ammonia and TSS levels <br />into the tanks during the pilot tests performed have been low, and it is important to understand a worse case situation. <br />Arcadis will summarize the results of the pilot testing in a brief memorandum. <br />Meetings and Site Visits: Arcadis will attend one additional meeting via conference call to discuss the pilot test results <br />with City staff. Pilot tests will be performed on site and will require three site visits. The pilot tests are scheduled to be <br />performed during May to July 2019. Should the pilot test schedule extend beyond the anticipated date or additional tests be <br />desired, additional visits may be necessary through a future amendment. <br />INFORMATION PROVIDED BY CLIENT <br />Client will provide the following information and assistance during the assignment: <br />1. Assistance to obtain the secondary treatment effluent sample for the bench scale pilot test. <br />2. Coordinate wet weather events and timing of pilot testing. <br />3. Maximize the chlorine dose to the fullest extent during pilot events. <br />4. Analyze E. coli samples (estimated total number of samples: 28 per test). <br />5. Analyze ammonia samples (estimated total number of samples: 4 per test). <br />6. Analyze TSS samples (estimated total number of samples: 4 per test). <br />7. Provide Monthly Report of Operations (MRO) and other operational data for 5-year period with available influent <br />ammonia into chlorine contact tanks, and final effluent ammonia and TSS concentration data for analysis. <br />SB W WTP Peak Flow Stress Testing and Optimization_Amendment No. 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.