My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to PSA - Seven Generations Architecture & Engineering - Muessel Grove Public Restroom Project
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Amendment No 1 to PSA - Seven Generations Architecture & Engineering - Muessel Grove Public Restroom Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 1:19:13 PM
Creation date
5/15/2019 3:04:53 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
5/14/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT K, consisting of 3 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated 05 Novenlb l., 2018. <br />AMENDMENT TO OWNER -ENGINEER AGREEMENT <br />Amendment No. 01 <br />1. Background Data <br />a. Effective Date of Owner -Engineer Agreement: 05 November-, 2018 <br />b. Owner: Board of Public Works City of South Bend, Indiana <br />..... _ ... . <br />C. Engineer: Seven Generations A+E <br />d. Project: VPA Muessel Grove Public Restroom <br />2. Description ofModifications: <br />[NOTE TO USER: Include the following paragraphs that are appropriate and delete those not applicable to <br />this amendment. Refer to paragraph numbers used in the Agreement or a previous amendment for clarity <br />with respect to the modifications to be made. Use paragraph numbers in this document for ease of <br />reference herein and in future correspondence or amendments.] <br />a. For the Additional Services or the modifications to services set forth above, <br />Owner shall pay Engineer the following additional or modified compensation: <br />Article 3 — SCHEDULE FOR RENDERING SERVICES <br />Item C: If Owner authorizes changes in the scope, extent, or character of the <br />Project, then the time for completion of Engineer's services, and the rates and <br />amounts of Engineer's compensation, shall be adjusted equitably. <br />It was requested by the Owner during the Final Design Phase to include <br />replacement of the existing water line as part of the Base Bid for this project. The <br />original project scope did not include replacement of the existing water line. <br />Additional Services Fee Breakdown (Attached) <br />Page 1 <br />(Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.