Board met in regular session at 10:00 A.M. John F. De Haven absent.
<br />e o
<br />Bids were received opened and read on the following improvements;
<br />Pipe sewer on Washington Avenue. '
<br />Bid of Geo. Pontarelli.
<br />12 inch pipe sewer, per lin ft... .:... ,.2.55
<br />8 Inch pipe sewer, per lin ft.....,............. .770
<br />6 inch pipe sewer per lin ft......... ....,... .75
<br />Manholes per ft. In depth.,.... .......,....... at 0
<br />Manholes, curbs and covers., each..... ....20.00
<br />Storm water inlets, each..........., .10.00
<br />Check.A100.00
<br />Bid of Brune De Peape.
<br />-12 inch pipe sewer, -per tin ft..................$2.50
<br />9 inch pipe sewer, per linft................... 1.00
<br />inch pipe sewer per lin ft....:............. 1.00-
<br />Manholes, per ft, In depth........,.............10.00
<br />Manholes, curbs and covers, each................22.00
<br />Storm water inlets, each.••'Check �for '100.00 " '12.00,
<br />Bid; of Stapl s & Ackerman.
<br />12 inch pipe sewer, per lin ft...............;...32.35
<br />8 inch pipe sewer, per lin ft.................. .80
<br />6 inch pipe sewer, per lin ft..... .....0.. 1.00
<br />Manholes per ft.................................. 8.50
<br />Manholes, curbs And covers, each................23.00
<br />Storm water inlets complete ....................'.13.00
<br />Check for L00.00
<br />Bid of Hoban &.Roach.
<br />12 inch pipe sewer, per lin ft....... 250
<br />.
<br />8 inch pipe sewer, per lin ft................ .50
<br />6 inch _pipe sewer, per lin ft.................. 1.00
<br />Manholes per lin ft.............................9.00
<br />Manholes, curbs and covers, each... ............20.00
<br />Storm.waer inlets, each ........................I0.00
<br />Check for $100.00
<br />Bid of L. H. Webster.
<br />12 inch pipe sewer per lin ft..,.........'.......2.90
<br />8 inch pipe sewer, per lin ft................ 0
<br />6 inch pipe sewer, per lin ft................... .80
<br />Manholes per Ft ................................ 7'7.51
<br />Manholes curbs and covers, each ... ............20,50
<br />Storm water inlets, each .......................12.50
<br />Check for $100.00
<br />Pipe sewer on High Street.
<br />Bid of Staples & Ackerman.
<br />12 inch pipe sewer, per lin ft...............a, 2.35
<br />8 inch pipe sewer, per lin ft................ .80
<br />6 inch pipe sewer per lin ft................. 1.00
<br />Manholes per lin ft...................0......0 .00
<br />Manholes curbs and covers, each.... ..........2 .00
<br />Storm wader inlets, each............•...••....1 .00
<br />Check for L00.00
<br />Bid of Hoban & Roach.
<br />12 inch pipe sewer per lin ft.................'2.%5
<br />8 inch pipe sewer pr lin ft..................
<br />6 inch pipe sewer, per lin ft..............x..20
<br />Manholes per ft..............................10.00
<br />Manholes curbs and covers, each..............21.00
<br />Check for $100.00
<br />Bid of..L. H. Webster.
<br />12 inch pipe sewer per lin ft.................14.00
<br />8 inch pipe sewer, per lin ft................. .90
<br />6 inch pipe sewer per lin ft, ....... oo ......... 1.20
<br />Manholes per Ft.............................0.21.00
<br />Manholes curbs and covers, each...............24.00
<br />Check for $100.00