Laserfiche WebLink
11aesday March 8th ,' 1921. . <br />a d 'et in regular .ad si4h At r 10:00"Ao ; fM• l 3. members present. <br />R. R. Smith Mgr. of the Chicago, South Bend & Northern Indiana <br />Railway Company and G. M. Gray Supt of the Chicago, Lake Shore and South Bend <br />Ry. Company met with the Board and the matter of the conditions of certain <br />cross.in s of their railways in this.City was discussed. `Mr, 8iith. <br />agreed .� y � Gray and �Ir:" - <br />o,coxsult with the Street Commissioner D._C. Layton and h <br />y e was instructed <br />by the Board=to give the.railway company the certain streets with defective <br />crossings, <br />Dr F.- G. Freyemarth appeared before the Board and took up the <br />mstter,of the.City paying,for the waterused at the United States Health Clinic, <br />The'Board agreed to pay for all water used at the Clinic and the Clerk was <br />instructed to notify the Water Dept. to'send bills for water t,o this Department <br />and same is to°be paid out of the water Fund of, the Board of Public Works. - <br />Mr. Taylor of Rarter Heights appeared before the` Board in re and <br />to the condition of.the-pavement in Harter Hei hts regard <br />g .The Board instructed the <br />Clerk to.notifyqthe Williston'Construction Company to make the necessary repairs <br />on pavement,in ffarter Heights under their guarantee bond on.ofile in this,Office. <br />The Board ordered two 100 C. P. lig-.1.ts on Peashway and Leeper <br />v <br />Mauer of condition of sidewalk and curbs on Ford Street, Dunham <br />and Huron Streets filed,by-Councilffian Ole uiezak. the Board ordered J. W.`Doy1e <br />of the White Construction Company to'take this mat er up with Councilman <br />Olejniczak and make the necessary repairs. <br />Board ordered a light placed at southeast corner of Scott Street <br />and Dubmil Avenue, <br />1 <br />Petition filed and resolution ordered prepared for sewer on Lebans <br />Street frea Indiana Avenue to Broadway, <br />Bid°received for the painting of the flag pale, dorners and all <br />tin on the cupola of City Hall., This referred to the Janitor Chas. Johnson. <br />Mr. ;J. W. Doyle Supt of the White Construction .Company appeared <br />before the Board and took up the mat er of site for asphalt plant on DuShan.e <br />propety on Sample Street and Olive Streets. Deferred action'unti.l Wednesday <br />at 1:30 A.M. March 9th.11921 to make trip of investigation. <br />t The following resolution adopted by the Board. <br />TRUNK SEWER IMPROVEMFNT RESOLUTION NO. 853. <br />Resolved by the Board of Public Works of the City of South Bend,, <br />County of St. Joseph State of Indiana: -That it is desired and deemed xecessar <br />to construct a sewer lu Indiana Avenue all in said City, which, from its size ana <br />character, is not.only intended and adapted for use by property owners whose <br />propertydfabuts tuna along the line of said sewer, but is also intended and <br />adapted o receiving sewage from collateral dra ns a ready constricted or <br />Which may be hereafter constructed and the same is hereby ordered -constructed in <br />an <br />d along the following line in. said City, to -wit:- Beginning at the inter- <br />e.ction o the center line of Olive Street and Indiana Avenue; thence east along <br />the center line of Indiana Avenue to the center of Grant Street with a 30 inch <br />circular sewer; thence still east along the center of Indiana Avenue to.the cent& <br />of Pulaski Street with a 24 inch ipe sewer• thence still east aloe the center <br />of Indiana Avenue to the center of Walnut Street with a 20 inch pip sewer,, <br />thence still east along the center of Indiana Avenue to the center of Webster <br />Street with an 18 inch vitrified pipe sewer -thence still east alongg the center <br />of Indiana A venue to the center of Arnold Street with a 15 inch -vitrified pippe <br />sewer; thence still east along the center of Indiana Avenue to a oint 70 feet <br />west of the westerly line of Prairie Avenue with a 12 inch vitrified pipe sewer; <br />together with the neeessary manholes, storm water inlets, conduitsm flush tanks <br />and house conneetions to the curb line &bong the line of said improvement: <br />And to be built in accordance with the profiles, specifications, <br />detail plans, maps and estimates now ow. file in the office of the De <br />pasrteat <br />of Public Works of said City which includes an estimate of the prapertidn:,that <br />the cost of an.adequate local sewer, built along the above line, bears to the <br />test of the main sewer, to be built as follows: The cost of an adequate local <br />sewer, built along the line of above described, is hereby estimated and fixed <br />to.be of the cost of the maix'sewer to be built along the said <br />line as above set forth,.which proportion, as herein estimated and fixed, shall <br />be taken quid adopted in all computations. requiring.& knowledge of the cost of <br />such local sewer if built,alone the line where the main sewer is to be built. <br />The cost of the construction or said sewer shall be divided as follows: <br />1. So much of such cost as shall be equivalent to the construction <br />,of an adequate. sewer net adapted to receive sewagge from collateral drains <br />or sewers, if along the polders <br />line as hereinabove set forth, shall be <br />Cy <br />by the abutting propert holders and the City ®f South Bend, if it be <br />te'rmine: that said City is enefited by said sewer <ta >the sate man a and to tl <br />