Laserfiche WebLink
tl w � m n wy�Jrer.a sr® ru w- <br />a Dr. Freyermuth appeared before the Board and requested permission <br />to have City pay for telephone at Isolation Hospital and Clinic. -Same granted by the Board. <br />2nd, Plat of Edgewater Place Addition approved as follows: - <br />DESCRIPTION OF PLAT. <br />The annexed plat re preSents the second , plat of Edgewater Place <br />addition to the City of South Bend. <br />The.attached-plat includes lots 8,9 1 1 ,12 and.14 in <br />Ed ew ter Plla a Addition, Lot 1 1 Hare Co rt Addiition il is a on of ae Riiv <br />Av in be%we.en Aron Ave. and ffarper,Cour�. The dimendlffla o1 a jots anvil w���� of ��e <br />street$ and alleys are given in feet -and fractions thereof. -Edgewater Drive has heretofore <br />been,opened by ;the. Board of Public Works and is hereby shown as forlherly opened by,said <br />Board.. The lots are indicated by letters as shown on the plat. The alley in the.rear <br />of Lot "N" is --largely for the benefit of Lot "M" kut is hereb dedicated for public use: <br />.The alley shown on the westerly side of said lot N""is hereW dedicated to public use by a <br />deed from Srah C. Hier and husband to Whitcomb & Keller and recorded in Deed Record No. 163 <br />on Page 505. <br />IN WITNESS WHEREOF, Whitcomb & Keller acknowledge the execution <br />'of this plat by'its President, Attested by the Secretary Treasurer, this 20th. day of <br />December 1920. Whitcomb 41 Weller <br />By_ FRED W. KELLER <br />STATE OF INDIANA �SS <br />ST. JOSEPH COUNTY Attest Leslie C. Whitcomb <br />Before me, the undersigned, a Notary Public -in and for said County <br />came Fred W. Keller, President and Leslie C. Whitcomb, Secretary -Treasurer and acknowledged <br />the execution of the attached plat. <br />Witness my hand and offical seal this 20th. day of December 1920. <br />MY commission expires 'CLAUDINE BRICKELL SMOKE <br />4u>1y109192.0 (SEAL) Notary Public <br />The following communication received, read and placed on file. <br />Dee, 16119200' <br />Mr. George A. Robertson, <br />South Bend , Ind . <br />Dear Sir <br />Answering yours of Dec. llth.. relative to fire damage. on the Auditorium Theatre <br />Building. <br />As per your request, I made a thorough inspection of this building and find <br />that while fire was- -tremely hot, the damage was almost entirely to the contents- of the <br />building; furniture, seats, carpet's, draperies, etc., and some of ,the interior wood worm <br />such as window and door casings, balcony and gallery railings and boxes, and a very <br />small section 'of the main floor. <br />There is no damage whatever to the general construction Walls were not effected <br />at all. In fact there is no damage that in any way effects the strength of the building - <br />with the exception of a new floor joist and they are only slightly burned on one edgge <br />and can be very easily re -placed. Structural and supporting members are in no way effeeted <br />Part of the finish coat of plasterly is slightly damaged from excessive heat and water.` <br />The general construction o this building is, concrete, foundation, heavy <br />.masonry brick walls, cast iron columns, and steel girders supporting -the wood floor con- <br />struction, of 3X14 joist. -Main roof and ceilings are supported on heavy steel trusses <br />spanning full width of Auditorium, supported on heavy steel columns built in masonry walls <br />and resting on top of concrete foundation. Roof is covered with tar and gravel roofing.,' <br />Interior.of.building is plastered on wire lath with asbestos fiber plaster. The building-.r <br />is equipped with a very complete sprinkler system, in basement, and store rooms on first <br />floor, ws well as in corridors and passage ways. These sprin*lers are exposes under the <br />ceilings. Throughout the Auditorium there is a complete sprinkler system in the space` <br />between the main floor and the store room ceilings, also in the space between the Audi-, <br />torium ceiling and roof. <br />While the fire in this building was probably the hotest that has ever taken: <br />place in a buolding in South Bend but did,no damage to,the construction of the buildingt. <br />is due to good design and construction,`Asbestos fibered fireproof plastering and the <br />complete system. <br />Yours very truly, <br />H. G. CHRISTMAN CO. <br />HGC:IC BYA* G. CHRISTMAN <br />.j <br />9 , <br />