tl w � m n wy�Jrer.a sr® ru w-
<br />a Dr. Freyermuth appeared before the Board and requested permission
<br />to have City pay for telephone at Isolation Hospital and Clinic. -Same granted by the Board.
<br />2nd, Plat of Edgewater Place Addition approved as follows: -
<br />DESCRIPTION OF PLAT.
<br />The annexed plat re preSents the second , plat of Edgewater Place
<br />addition to the City of South Bend.
<br />The.attached-plat includes lots 8,9 1 1 ,12 and.14 in
<br />Ed ew ter Plla a Addition, Lot 1 1 Hare Co rt Addiition il is a on of ae Riiv
<br />Av in be%we.en Aron Ave. and ffarper,Cour�. The dimendlffla o1 a jots anvil w���� of ��e
<br />street$ and alleys are given in feet -and fractions thereof. -Edgewater Drive has heretofore
<br />been,opened by ;the. Board of Public Works and is hereby shown as forlherly opened by,said
<br />Board.. The lots are indicated by letters as shown on the plat. The alley in the.rear
<br />of Lot "N" is --largely for the benefit of Lot "M" kut is hereb dedicated for public use:
<br />.The alley shown on the westerly side of said lot N""is hereW dedicated to public use by a
<br />deed from Srah C. Hier and husband to Whitcomb & Keller and recorded in Deed Record No. 163
<br />on Page 505.
<br />IN WITNESS WHEREOF, Whitcomb & Keller acknowledge the execution
<br />'of this plat by'its President, Attested by the Secretary Treasurer, this 20th. day of
<br />December 1920. Whitcomb 41 Weller
<br />By_ FRED W. KELLER
<br />STATE OF INDIANA �SS
<br />ST. JOSEPH COUNTY Attest Leslie C. Whitcomb
<br />Before me, the undersigned, a Notary Public -in and for said County
<br />came Fred W. Keller, President and Leslie C. Whitcomb, Secretary -Treasurer and acknowledged
<br />the execution of the attached plat.
<br />Witness my hand and offical seal this 20th. day of December 1920.
<br />MY commission expires 'CLAUDINE BRICKELL SMOKE
<br />4u>1y109192.0 (SEAL) Notary Public
<br />The following communication received, read and placed on file.
<br />Dee, 16119200'
<br />Mr. George A. Robertson,
<br />South Bend , Ind .
<br />Dear Sir
<br />Answering yours of Dec. llth.. relative to fire damage. on the Auditorium Theatre
<br />Building.
<br />As per your request, I made a thorough inspection of this building and find
<br />that while fire was- -tremely hot, the damage was almost entirely to the contents- of the
<br />building; furniture, seats, carpet's, draperies, etc., and some of ,the interior wood worm
<br />such as window and door casings, balcony and gallery railings and boxes, and a very
<br />small section 'of the main floor.
<br />There is no damage whatever to the general construction Walls were not effected
<br />at all. In fact there is no damage that in any way effects the strength of the building -
<br />with the exception of a new floor joist and they are only slightly burned on one edgge
<br />and can be very easily re -placed. Structural and supporting members are in no way effeeted
<br />Part of the finish coat of plasterly is slightly damaged from excessive heat and water.`
<br />The general construction o this building is, concrete, foundation, heavy
<br />.masonry brick walls, cast iron columns, and steel girders supporting -the wood floor con-
<br />struction, of 3X14 joist. -Main roof and ceilings are supported on heavy steel trusses
<br />spanning full width of Auditorium, supported on heavy steel columns built in masonry walls
<br />and resting on top of concrete foundation. Roof is covered with tar and gravel roofing.,'
<br />Interior.of.building is plastered on wire lath with asbestos fiber plaster. The building-.r
<br />is equipped with a very complete sprinkler system, in basement, and store rooms on first
<br />floor, ws well as in corridors and passage ways. These sprin*lers are exposes under the
<br />ceilings. Throughout the Auditorium there is a complete sprinkler system in the space`
<br />between the main floor and the store room ceilings, also in the space between the Audi-,
<br />torium ceiling and roof.
<br />While the fire in this building was probably the hotest that has ever taken:
<br />place in a buolding in South Bend but did,no damage to,the construction of the buildingt.
<br />is due to good design and construction,`Asbestos fibered fireproof plastering and the
<br />complete system.
<br />Yours very truly,
<br />H. G. CHRISTMAN CO.
<br />HGC:IC BYA* G. CHRISTMAN
<br />.j
<br />9 ,
<br />
|