My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Water Treatment Chemicals 2019-2020 - PVS Minibulk Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - Water Treatment Chemicals 2019-2020 - PVS Minibulk Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 3:35:42 PM
Creation date
4/24/2019 10:27:34 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/23/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
F, PERIODIC RETESTING AND RE -INSPECTION <br />1. Cylinder and Ton Containers to be Tested <br />0) Cylinders (except DOT 3E 1800) and Ion containers must be retested at least <br />once infii,eyears (DOTSection 173,34e and Section 173,31d). <br />b) C�Ylinders cannot befilled until they urca releved after the free year ajinij,ersajy <br />ql'the inon1h in which it s,i,e,'is tested 7)n containers can be filled until the end <br />the calendar ye a*r during which their.lim year fesl is clue. <br />c) Retests are also required after any reheat treatment, In addition, retest any <br />container which shows evidence of weakness at any time, or show a 5 percent or <br />more loss in i,i,eight. <br />2. Test Procedure <br />a) Cylinders and ton conlainers are hydroslatically retested by the hydrostatic <br />eXPOnsk)" melhod I'DOTSecNem / 73_34 (") (uld Serlion / '3,31 (d)'J, i1'ct( the <br />tinte qfreqnalsficaoon (I containershoinv a leak or a permanent expansion I't'hich <br />exceedS 10'% ()I'Ihc' total expansion, it must he condemned. <br />3. Container Records <br />a) Records inust be kept shmi,ing results qf'the test. Each container must have the <br />lest date plainly und into the metal of one head or the <br />chilne q1'each lavk pussing the /y4koslatic retest. <br />G, CONDITIONS OF DELIVERY <br />1. A South Bend Water Works representative shall ; peci ry the location to,, <br />chlorine cylinder and Lon container deliveries, <br />2. Delivery Locations: <br />3. Vendor personnel shall conduct all activities related to the loading and <br />unloading of cylinders, <br />4. Ton containers will need to be delivered with a cherry picker. <br />5. Minimum deliveries are one (1) ton containers and twelve (12) 150# <br />cylinders, <br />6. Supplier must be able to giinrijitck, delivery wiLhin 3 Lo 4 calendar days after <br />order placement <br />7. Vendor J.)ersonnel shall not unload any filled cylinders or ton containers prior <br />to live inspection by South Bend Water Works Persoimej. <br />
The URL can be used to link to this page
Your browser does not support the video tag.