My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Spec E - One or More 2019 or Newer One-Ton Crew Cab Four Wheel Drive Pickup Truck - Jordan Ford
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - Spec E - One or More 2019 or Newer One-Ton Crew Cab Four Wheel Drive Pickup Truck - Jordan Ford
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 10:54:39 AM
Creation date
4/24/2019 10:13:31 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/23/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DATE QUOTE <br />��� �,� 4/9/2019 190409AT <br />A (t <br />�J z/ <br />Tuet'S"ystems NAME / ADDRESS <br />Fresno, CA * Elkhart, IN Deb Starkweather <br />Jordan Automotive Group <br />Mishawaka, IN <br />Anthony Tellez <br />anthony@alalduels.com <br />P.O. NO. TERMS REP END USER FOB <br />Due on Completion AT South Bend Elkhart, IN <br />ITEM DESCRIPTION QTY PRICE EA. <br />Alternate 3 <br />EPA Certified Bi-Fuel CNG System <br />F350-W10-UB-BF 10 GGE 2019 F350 6.2L Crew Cab 160" WB 1 $10,900.00 <br />CNG Tanks Mounted Underbody Aft -Axle; OEM Midship Gasoline Per Unit <br />Tank Must Be Ordered <br />Alternate 4 / `1 <br />F350-W19-UB EPA Certified Dedicated CNG System 1 r $11 „4b F " <br />19 GGE 2019 F350 6.2L Crew Cab 160" WB Per Unit <br />CNG Tanks Mounted Underbody Aft -Axle and Midship <br />All CNG system related items in South Bend bid sent by D <br />Starkweather on 4/3/19 are included, EXCEPT: <br />• Tanks to be installed are Type 1, not Type 4, which is industry <br />standard for this vehicle type. <br />• Tanks will amount to 10 GGE, not the required 20 GGE. Because <br />this is a bi-fuel unit with a gasoline tank underbody, the most <br />underbody CNG capacity is 10 GGE. More GGE can be achieved <br />with tanks not mounted underbody, such as back -of -cab tanks. The <br />Alternate 4 dedicated option also does not meet the 20 GGE <br />minimum because of available space. <br />• No methane detector is provided. It is not recommended on this <br />vehicle e. <br />Note: Quote is contingent on 2019 EPA certification. <br />Note: Quote is good 60 days and is FOB Elkhart, IN. <br />Note: CNG tanks will have approximately 1000psi upon completion. <br />Note: After receipt of purchase order, vehicle will be put into production schedule. <br />Note: Please allow 30 working days for parts ordering and receiving upon receipt of PO. After parts and vehicle <br />arrive please allow 40 working days for delivery of first vehicle, and approximately 5 days for two additional <br />vehicles. <br />Note: Tank packages,ub'ect to engineering confirmation. <br />BUYER AUTHORIZATION : Buyer's signature below is acceptance to purchase the product identified above. <br />Signature............ ......,.,.... . ........... ....,................. .... Date: ... —..,._. ------------------ <br />floor P I a n <br />
The URL can be used to link to this page
Your browser does not support the video tag.