My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Bid - Historic Leeper Park Improvements Project No 118-010A - Ancon Construction Co Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Award Bids
>
Award Bid - Historic Leeper Park Improvements Project No 118-010A - Ancon Construction Co Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 9:32:02 AM
Creation date
4/24/2019 10:02:05 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
4/23/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BID/PROPOSAL��� <br />CITY OF SOUTH BEND <br />Project <br />Name; Historic Leeper Park Improvements <br />- Bid Package <br />1 <br />Project <br />Number„ 118-010A <br />�.-...... <br />___-__ - <br />For <br />Bids Due. April 18, 2019 <br />Contractor <br />Name: Ancon Construction Co., Inc. <br />BASE BID <br />See Attached Detail <br />ITEM <br />.................................................... <br />DESCRIPTION <br />QUANTITY <br />UNIT .- <br />_.........................FNM-_ <br />UNIT <br />ITEM <br />ww <br />COST <br />TOTAL <br />1 <br />MAINTAINING TRAFFIC _ <br />1.00 <br />LS <br />2 <br />. <br />CONSTRUCTION ENGINEERING <br />1.00 <br />--.. <br />LS <br />.............. ......_ <br />_W..---- <br />3 <br />MOBILIZATION AND DEMOBILIZATION ---_ <br />mm1m.00 .... ........ _.... <br />LS <br />4 <br />TREE, 10 IN., REMOVE <br />3.00 <br />EACH <br />5 <br />TREE, 18 IN., REMOVE <br />4.00 <br />EACH <br />6 <br />TREE, 30 IN., REMOVE <br />4.00 <br />EACH <br />7 <br />............_............. . ... <br />TREE, 48 IN., REMOVE <br />3.00 _ ., <br />EACHITITIT <br />ITITITITITITITITITITITITIT......__'_ <br />8 <br />TREE, 60 IN., REMOVE <br />1.00 <br />EACH <br />9 <br />_----------------- <br />TREE PROTECTION <br />1.00 <br />LS <br />_.---........ ...._ <br />10 <br />STRUCTURES AND OBSTRUCTIONS, REMOVE <br />1.00 <br />LS <br />11 <br />.......... . ...... _......... ..... <br />DISPOSAL OF BIOSOLIDS (BOTTOM OF POND, <br />137.00 <br />CYS <br />...._ <br />UNDISTRIBUTED) <br />....... ........ <br />12 <br />4$ 24IN STORM SEWER, REMOVE <br />...._. <br />105.00 <br />............... <br />LFT <br />13 <br />_.................. <br />CURB, CONCRETE, REMOVE <br />.. <br />34.00 <br />LFT <br />_. .................... <br />14 <br />.._................e.e.e. - - <br />CURB AND GUTTER, REMOVE <br />230.00 .. ----_ <br />LLF..........- <br />............__ <br />15 <br />........ <br />CONCRETE STEPS, REMOVE <br />1.00 <br />LS <br />.......... <br />16 <br />................................. <br />REMOVE, PLAYGROUND EQUIPMENT <br />-----........----...� <br />1.00 <br />LS <br />�. <br />17 <br />SIDEWALK CONCRETE, REMOVE <br />605.00 <br />S Y S <br />18 <br />��----_----.�. ...................... <br />RETAINING WALL, REMOVE (AROUND POND) <br />742.00 <br />LFT <br />_-_---�-_........... <br />19 <br />............................ ......... <br />FENCE, CHAIN. LINK, REMOVE <br />574.00 <br />LFT <br />._...... I-- <br />- <br />_...__..... <br />20 <br />... ...... ..-- <br />CURB, ASPHALT, REMOVE <br />---................... _ <br />574.00 <br />LFT <br />21 <br />CONCRETE, REME (POND LINE°_...._.---_..----- <br />OVR ) <br />183.00 <br />CYS <br />_ .......... <br />............................. <br />22 <br />CONCRETE, REMOVE <br />........................................ <br />1.00 <br />CYS <br />23 <br />SALVAGE BRICK PAVERS <br />28.00 <br />SYS <br />24 <br />SALVAGE TRASH CANS <br />2.00 _�-----_ <br />mmEACH <br />25 <br />........................ <br />DEWATERING, SPECIAL <br />1.00 <br />LS <br />........... ... <br />_-_--......... <br />26 <br />___._-------__.ww_ <br />EXCAVATION, COMMON <br />1,985.00 <br />. <br />CYS <br />27 <br />BORROW <br />1,383.0,0 <br />CYS <br />28 <br />...................................................................._............................................................�� <br />COMPACTED AGGREGATE #53, BASE <br />509.00 <br />CYS <br />29 <br />VARIABLE MILLING <br />93.00 <br />SYS <br />Version 1/17/2019 Contractor's Bid for Public Works - 54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.