Laserfiche WebLink
City of South Bend, Indiana <br />Department of Public Works <br />Project: Historic Leeper Park Improvements- bid package 1 <br />City Project No. 118-010A <br />Ancon Construction <br />Item <br />Unit Price <br />Amount <br />Description <br />Quantity <br />Unit <br />Number <br />Dollars/Cents <br />Dollars/Cents <br />26 <br />Excavation, Common <br />CYS <br />$11.92 <br />$23,655.60 <br />1,985.00 <br />27 <br />Borrow <br />CYS <br />$23.83 <br />$32,962.92 <br />1,383.00 <br />28 <br />Compacted Aggregate #53, Base <br />CYS <br />$59.59 <br />$30,329.22 <br />509.00 <br />29 <br />Variable Milling <br />SYS <br />$35.75 <br />$3,324.89 <br />93.00 <br />30 <br />Asphalt Surface <br />TON <br />$715.03 <br />$7,150.31 <br />10.00 <br />31 <br />Asphalt for Tack Coat <br />TON <br />$1.19 <br />$1.19 <br />1.00 <br />32 <br />PCCP, 8 in., (fountain plaza) <br />SYS <br />$41.75 <br />$14,111.05 <br />338.00 <br />33 <br />Sidewalk, Concrete, 4 in. <br />SYS <br />$50.61 <br />$231,834.39 <br />4,581.00 <br />34 <br />Curb Ramp, Concrete <br />SYS <br />$102.09 <br />$8,064.90' <br />79.00 <br />35 <br />Detectable Warning <br />LFT <br />$44.16 <br />$2,737.93' <br />62.00 <br />36 <br />Curb, Concrete, Modified (art nodes) <br />LFT <br />$79.85 <br />$4,072.10 <br />51.00 <br />37 <br />Curb, Concrete, Modified (historic steps) <br />LFT <br />$35.33 <br />$1,377.80 <br />39.00 <br />38 <br />Curb and Gutter, Concrete <br />LFT <br />$51.24 <br />$15,936.85 <br />311.00 <br />I <br />39 <br />Curb, Concrete <br />LFT <br />$65.54 <br />$4,915.84 <br />75.00 <br />40 <br />Flush Concrete Band <br />LFT <br />$36.07 <br />$6,456.21 <br />179.00 <br />41 <br />Cast Limestone Ball Finial <br />EACH <br />$1,361.60 <br />$6,807.99 <br />5.00 <br />42 <br />Cast Limestone Urn <br />EACH <br />$2,865.68 <br />$22,925.42 <br />8.00 <br />43 <br />Erosion Control Blanket <br />SYS <br />$7.15 <br />$228.81 <br />32.00 <br />44 <br />Mulched Seeding u <br />SYS <br />$0.89 <br />$26,188.00 <br />29,300.00 <br />45 <br />Nursery Sodding <br />SYS <br />$5.96 <br />$5,160.14 <br />866.00 <br />46 <br />Fountain and Equipment Installation <br />LS <br />$22,761.82 <br />$22,761.82' <br />1.00 <br />47 <br />Fountain Start Up and Instruction <br />LS <br />$3,575.15 <br />$3,575.15 <br />1.00 <br />48 <br />Fountain Grate and Frame <br />EACH <br />$3,325.89 <br />$3,325.89 <br />1,00 <br />49 <br />Quick Coupler <br />EACH <br />$2,383.44 <br />$2,383.44 <br />1.00 <br />50 <br />Backflow Preventer Cover <br />LS <br />$8,937.89 <br />$8,937.89' <br />1.00 <br />Page 2 of 5 <br />