My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Historic Leeper Park Improvements Project No 118-010A - Larson Danielson Construction Co
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - Historic Leeper Park Improvements Project No 118-010A - Larson Danielson Construction Co
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 9:41:55 AM
Creation date
4/23/2019 8:16:33 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/23/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Name: <br />Project Number: <br />For Bids Due: <br />Contractor Name: <br />-BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Historic Leeper Park Improvements — Bid Package 1 <br />................. <br />118-010A <br />April 18, 2019 <br />Larson Danielson Construction Company, <br />Inc. <br />30 <br />ASPHALT SURFACE <br />10.00 <br />TON <br />G q & (� <br />/�� <br />�/ k� <br />31 <br />ASPHALT FOR TACK COAT <br />1.00 <br />TON <br />1 <br />32 <br />PCCP, 8 IN. (FOUNTAIN PLAZA) <br />338.00 <br />SYS <br />33 <br />SIDEWALK, CONCRETE, 4 IN. <br />4,581.00 <br />SYS <br />r1 V <br />34 <br />CURB RAMP, CONCRETE <br />79.00 <br />1 SYS <br />35 <br />DETECTABLE WARNING <br />62.00 <br />LFT <br />Ll <br />36 <br />CURB, CONCRETE, MODIFIED (ART NODES) <br />51.00 <br />LFT <br />3 <br />37 <br />CURB, CONCRETE, MODIFIED (HISTORIC STEPS) <br />39.00 <br />LFT <br />60 <br />38 <br />CURB AND GUTTER, CONCRETE <br />311.00 <br />LFT <br />39 <br />CURB , CONCRETE <br />75.00 <br />LFT <br />40 <br />FLUSH CONCRETE BAND <br />179.00 <br />LFT <br />41 <br />CAST LIMESTONE BALL FINIAL <br />5.00 <br />EACH <br />•� <br />m <br />42 <br />CAST LIMESTONE URN <br />8.00 <br />EACH <br />5��g <br />43 <br />EROSION CONTROL BLANKET <br />32.00 <br />SYS <br />2-: - <br />44 <br />MULCHED SEEDING U-- .. <br />29,300.00 <br />SYS5 <br />45 <br />NURSERY SODDING <br />866.00 <br />aYS <br />46 <br />FOUNTAIN AND EQUIPMENTINSTALLATION _ <br />,1.00 <br />LS <br />47 <br />FOUNTAIN START UP AND INSTRUCTION <br />1.00 <br />LSE <br />\-I <br />48 <br />FOUNTAIN GRATE AND -FRAME <br />1.00 <br />—I <br />EACH <br />49 <br />QUICK COUPLER _ <br />1.00 <br />EACH <br />50 <br />BACKFL OW PREVENTER COVER <br />. <br />100 <br />LS <br />• �6� , <br />,����� <br />� 51 <br />3 IN. FOUNTAIN DRAIN -LINE <br />40.00 <br />LFT <br />C��� <br />52 <br />48 24 IN DUCTILE IRON PIPE WITH GRANULAR <br />97.00 <br />LFT <br />BACKFILL <br />53 <br />RELOCATE EXISTING WATER SPIGOT <br />1.00 <br />EACH <br />54 <br />CAP POND OVERFLOW <br />1.00 <br />EACH <br />55- <br />PIPE ENCASEMENT <br />80.00 <br />LFT <br />56 <br />CASTING, ADJUST TO GRADE <br />7.00 <br />EACH <br />57 <br />MANHOLE, 48 IN DIAMETER <br />2.00 <br />EACH <br />�-7� <br />8 <br />3/4 IN WATER LINE <br />180.00 <br />LFT19- <br />l <br />59 <br />3/4 IN WATER LINE TAP WITH CORP. STOP <br />1:00 <br />EACH <br />l <br />60 <br />FOUNTAIN PLUMBING <br />1.00 <br />LS <br />o <br />9 <br />Version 1/17/2019 Contractor's Bid for Public Works - 55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.