My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Historic Leeper Park Improvements Project No 118-010A - Ancon Construction Co Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - Historic Leeper Park Improvements Project No 118-010A - Ancon Construction Co Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 9:38:59 AM
Creation date
4/23/2019 8:14:21 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/18/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Indiana/Kentucky <br />Chaoter <br />Asso.clated Builders $ <br />Contractors of <br />Indlana/Kentucky <br />5001 N Shadeland Avenue <br />Indianapolis, IN 46226 <br />317-596-4950 <br />Apprentices attend school for 4 years. Classes are held <br />one night per week for 4 hours with 3 hours of online study. All programs are <br />approved by the U.S. Department of Labor, Office of Apprenticeship. <br />Basic Safety Commercial Rigging Equipment Site Layout 1: Dis- <br />Drawings tance Measurement <br />& Leveling <br />Intro to Construction <br />Math <br />Intro to Hand Tools & <br />Power Tools <br />Intro to Construction <br />Drawings <br />Basic Rigging <br />Basic Communica- <br />tions <br />Basic Employability <br />Skills <br />Intro to Materials <br />Handling <br />Orientation to the <br />Trade <br />Building Materials, <br />Fasteners & Adhe- <br />sives <br />Hand & Power Tools <br />Introduction to Con- <br />struction Drawings, <br />Specs & Layout <br />Floor Systems <br />Wall Systems <br />Ceiling Joist & Roof <br />Framing <br />Basic Stair Layout <br />Introduction to Build- <br />ing Envelope Systems <br />Roofing Applications Rigging Practices Site Layout II: Angu- <br />Thermal & Moisture <br />Protection <br />Exterior Finishing <br />Cold -Formed Steel <br />Framing <br />Drywall Installation <br />Drywall Finishing <br />lar Measurement <br />Properties of Con- <br />Advanced Roof <br />crete <br />Systems <br />Reinforcing Concrete <br />Advanced Wall <br />Systems <br />Handling & Placing <br />Advanced Stair <br />Concrete <br />Systems <br />Trenching & Exca- <br />Introduction to Light <br />vating <br />Equipment <br />Foundations & Slab- <br />Welding <br />On -Grade <br />Doors and Door Vertical Framework i Commercial Finish <br />Hardware <br />Suspended Ceilings Horizontal Frame- <br />work <br />Window, Door, Floor Tilt -Up Wall Panels <br />& Ceiling Trim <br />Cabinet Installation <br />& Fabrication <br />Work <br />Site Preparation <br />Introductory Skills for <br />the Crew Leader: <br />Orientation to the Job <br />Leadership Skills <br />Safety <br />Project Control <br />N <br />
The URL can be used to link to this page
Your browser does not support the video tag.