Laserfiche WebLink
BID/PROPOSAL-�„ <br />CITY OF SOUTH BEND. <br />Project <br />Name: Historic Leeper Park Improvements <br />— Bid Package <br />9 1 <br />Project <br />_........... <br />Number: 118-010A .......................,., <br />._...... <br />For <br />............... <br />Bids Due: April 18, 2019 <br />........ <br />... <br />a <br />, <br />Contractor <br />Name: Ancon Construction Co., Inc. <br />..................... <br />. . <br />30 <br />___ .. <br />___ .............-._.. w__u- <br />ASPHALT SURFACE <br />10.00 <br />I TON <br />_ <br />.---- <br />31 <br />ASPHALT FOR TACK COAT <br />1.00 _ <br />TON <br />32 <br />--------------_-.........----._.... <br />PCCP, 8 IN. (FOUNTAIN PLAZA) <br />338.00 <br />SYS <br />-............. <br />33 <br />SIDEWALK,mmCONCRETE, 4 IN. <br />4,581.00 <br />SYS <br />_-._.... <br />34 <br />CURB RAMP, CONCRETE <br />79.00 <br />SYSFm <br />................. <br />.............. <br />35 <br />___- n.._.m,,.. ............ .......... _ <br />DETECTABLE WARNING <br />62.00� <br />LFT <br />36 <br />CURB, CONCRETE, MODIFIED (ART NODES) <br />51.00 <br />LFT <br />37 <br />CURB, CONCRETE, MODIFIED (HISTORIC STEPS) <br />39.00 <br />LFT <br />38 <br />---_-_-----------------_.... <br />CURB AND GUTTER, CONCRETE _ <br />311.00 <br />LFT <br />_.-............................_._. <br />._- ......... <br />39 <br />.......... w �.. _.... ....._. <br />CURB, CONCRETE <br />75.00 <br />LFT <br />_................' <br />40 <br />FLUSH CONCRETE BANDmmmmm WW <br />179.00 . <br />LFTmmmmWWW <br />41 <br />CAST LIMESTONE BALL FINIAL <br />5 00 <br />EACH <br />42 <br />CAST LIMESTONE URN <br />8.00 <br />EACH <br />43 <br />EROSION CONTROL .,�-� <br />BLANKET <br />32.00 <br />SYS <br />44 <br />MULCHED SEEDING U <br />29,300.00 <br />SYS <br />45 <br />.__ .. <br />NURSERY SODDING <br />866.00 <br />SYS <br />--� <br />46 <br />FOUNTAIWN AND EQUIPMENT INSTALLATION <br />1.00 <br />LS <br />47 <br />-------------------------_ <br />FOUNTAIN START UP AND INSTRUCTION <br />1.00 <br />LS <br />....... <br />48 <br />__ ............... ..__..... . ......... <br />FOUNTAIN GRATE AND FRAME <br />1.00 <br />EACH <br />.......... _- <br />49 <br />QUICK COUPLER-----.....M <br />1.00 <br />EACH <br />-_... <br />50 <br />-... � �. ............................ <br />BACKFLOW PREVENTER COVER <br />1.00 <br />mmLS <br />�..........3 <br />m <br />IN. FOUNTAIN <br />IN DRAIN LINE <br />........ <br />40.00 <br />LFT <br />52 <br />18 24 IN DUCTILE IRON PIPE WITH GRANULAR <br />97.00 <br />LFT <br />BACKFILL <br />53 <br />RELOCATE EXISTING WATER SPIGOT .... ....� <br />1.00 <br />EACH.. <br />54 <br />CAP POND OVERFLOW WWWWWWW <br />.................___A <br />1.00 <br />EACH <br />_� <br />........................� <br />55 <br />_ _-w.._ <br />u--.......M .. <br />PIPE ENCASEMENT <br />80.00 <br />LFT <br />--_ _... <br />. <br />56 <br />.... ....... ... <br />CASTING, ADJUST TO GRADE <br />7.00 <br />EACH <br />— <br />57 <br />_--__................. <br />MANHOLE, 48 IN DIAMETER <br />...... <br />2.00 <br />EACH <br />_.._._................ <br />58 <br />3/4 IN WATER LINE _----........ <br />180.00 <br />LFT <br />.......... <br />59 <br />3/4 IN WATER LINE TAP WITH CORP. STOP <br />1.00 _ <br />EACH <br />60 <br />FOUNTAIN PLUMBING <br />1.00 <br />LS,.,._..___ <br />Version 1/17/2019 Contractor's Bid for Public Works - 55 <br />