My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Proposal - ME Simpson Co Inc - Testing and Repair of Large Meters for SB Water Leak Survey
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Proposal - ME Simpson Co Inc - Testing and Repair of Large Meters for SB Water Leak Survey
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 2:34:50 PM
Creation date
4/10/2019 10:54:50 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
4/9/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
M.E. Simpson Co., Inc. I (Large Water Meter rest and Pepak (Program Page 3 <br />Quality Control for Meter Testing and Calibration <br />The level of quality control for large meter testing takes in the above considerations and apply them to <br />each large meter setting under evaluation. When a strict methodology and field procedure are followed, <br />the field conditions can be controlled and mitigated to produce test results that are reliable and <br />accurate. <br />Water Utility Observations <br />The M.E. Simpson Co., Inc. Project Team welcomes Utility staff members to observe field procedures <br />while the Meter Testing Program is in progress. Explanation and understanding of the equipment and <br />techniques used for testing large meters may be useful in helping Utility staff members understand how <br />they may use large meter testing to reduce revenue losses for commercial and industrial accounts. <br />Final Reports, Documentations & Communications <br />in <br />Project Team will meet daily with assigned Utility personnel to go over areas of survey from <br />prior workday and plan current day and area to survey. <br />The field technicians will be readily available by cell phone. This will facilitate <br />communications between the Utility and the field technicians. A 24-hour toll -free 800 <br />number is available for direct contact with M.E. Simpson Co., Inc. for emergencies. <br />Document all meter testing, date of testing, and all data required by the Utility to analyze <br />the meter inaccuracies. These will be reported daily to appointed Utility Personnel. <br />The Project Manager will meet with the Utility as needed for a progress report. <br />Maintain a project progression list indicating meters tested and to be tested, contact names, <br />phone numbers, etc. <br />Prepare meter reports at the completion of the project, which will include all meter testing <br />reports, listing of new parts installed, and possible mechanical deficiencies that need the <br />attention of the Utility. Recommendations for system maintenance will be a part of this <br />report based on field observations made during the testing program. This final report shall <br />be made available for submission ITmtomthe Utilitv within twenty+ JM working y q <br />completion of the fieldwork. <br />
The URL can be used to link to this page
Your browser does not support the video tag.