Laserfiche WebLink
JWHO <br />LEFT BRAINS. <br />force RIGHT BRAINS. <br />BRAND SOUL. <br />0, <br />March 27, 2019 <br />Estimate — City of South Bend <br />Public Works / Design of graphics for Solid Waste Trucks <br />The Need: Updated / redesigned graphics for South Bend City Solid Waste trucks. The truck <br />graphics need to convey the mission and values for Solid Waste and the City and reflect <br />established brand standards. <br />Project Description: <br />New design for graphics on SB City Solid Waste trucks (9 total), following the established brand. <br />The graphics need to include the City identity as well as the City flag influence. The opportunity <br />for graphics includes truck side panels, back panel and driver door. Other essential design <br />elements are the vehicle number and possibly the license number. <br />Project Scope: <br />• Force 5 will meet with appropriate members of the Public Works team to discuss project <br />specifics; <br />• See actual truck and determine measurements (if not already known) of the available <br />design area; <br />• Present 2 designs for review; 2 rounds of iterations of design; (Assumption of 1 design <br />selected for use on all 9 trucks); *Additional sizes may be needed depending on truck <br />dimensions, selected design will be modified to accommodate, up to 3 different sizes. <br />• Upon final approval, Force 5 will create print -ready artwork and deliver to selected <br />vendor. <br />Scheduling: <br />- Based on client input, the project would be awarded in early April. It is estimated the <br />entire process, including application of graphics, to be 2-3 months total. <br />- Initial meeting(s), presentation of designs / iterations / final selection / creation of print <br />ready graphics — completed within the first 4-6 weeks; Weeks 7-12 for production / <br />application of graphics on trucks. <br />Force 5 —1433 Northside Blvd. — South Bend, IN 46615 — 574.234.2060 — www.DiscoverForce5.com <br />