Laserfiche WebLink
BID/PROPOSAL <br />�o�r°r•r�',y <br />CITY OF SOUTH BEND 11� 710 <br />n, <br />Project Name: Technology Resource Center <br />Project Number: 118-090 � <br />For Bids Due: March 26th 2019 at 9:30 AM Local Time <br />Contractor Name: Mal.ority Builders, Inc. <br />ALTERNATE NO.4 <br />Item Description Quantity Unit Total Amount <br />No. <br />1 Provide a deduct price to furnish and install Corian solid surface <br />vanity top in lieu of Corian quartz vanity top. 1 SF $-3, 691.00 <br />TOTALBASEBID $-3,691.00 <br />ALTERNATE NO. 5 <br />Item Description Quantity Unit Total Amount <br />No. <br />Provide a deduct price to furnish and install hollow metal office <br />1 storefront system with painted finish in lieu of C.R. Laurence Series 1 LF $+11, 389.00 <br />487 aluminum office storefronts stem. <br />TOTAL BASE BID 1$+11,389.00 <br />ALTERNATE NO. 6 <br />Item <br />Description <br />Quantity <br />Unit <br />Total Amount <br />No. <br />Provide new electrical service as shown on Sheet E3-106 for <br />future tenants A,B, and C. All lighting fixtures, power devices, and <br />1 <br />circuiting to the associated panels as shown on the electrical floor <br />1 <br />LS <br />$+30, 887.00 <br />plans shall be part of this work. Any structures required to support <br />the new electrical service to match existing to also be part of this <br />work. <br />TOTAL BASE BID <br />$+30, 887.00 <br />PER ADDENDUM 18: <br />FURNISH AND INSTALL COMPACTED FILL TO SUPPORT THE SPECIFIED 4""SLAB DEPTH. <br />ADD: $ 9,505.00 <br />Version 8/16/2018 Special Provisions - 8 <br />