Laserfiche WebLink
City of South Bend <br />118-077 <br />DLZ Project No.1861-1578 <br />Estimate of Probable Construction Cost <br />Pinhook <br />Park Pavilion <br />• , T + <br />1 <br />Description <br />Quantity <br />Units <br />Unit Price <br />Total <br />Subtotals <br />Mobilization / Demobilization / Admin <br />1 <br />LS <br />$2,000.00 <br />$2,000.00 <br />R.. ...- <br />emove casework, countertop, fixtures, lighting <br />1 <br />LS <br />$1,800.00 <br />- <br />-- ------ <br />$1,800.00 <br />Repair OH coiling door ............. <br />1 <br />EA .. <br />$400.00 <br />$400.00 <br />m............... --.-...... ...... <br />Remove wall between Kitchen and Concessions <br />120 <br />SF <br />......... ..,_ ..... , .. .,.,. <br />$28.00 <br />--- <br />$3,360.00' <br />Patch existing walls at removed walls <br />1 <br />LS <br />$4,500.00 <br />$4,500.00 <br />Remove . ... <br />oor (HM and OH coiling) <br />_.. <br />2 <br />EA <br />$400.00 <br />$800.00 <br />......... <br />Remove and abate pipe insulation <br />1 <br />LS <br />--------- <br />$2,500.00 <br />--------- <br />$2,500.00 <br />Remove ... ...p.a.. <br />quarry tile flooring <br />__ _-------- <br />........- <br />355 <br />SF <br />$8.00 <br />$2,840.00 <br />N....... _ <br />ew CMU <br />130 <br />SF <br />$20.00 <br />$2,600.00 <br />New HM door, frame, and ' hardware <br />_ <br />1 <br />EA <br />$2,000.00 <br />$2,000.00 <br />_ -------- <br />Install new pipe insulation <br />1 <br />LS <br />$800.00 <br />_. <br />$800.00 <br />Acoustical panel ceiling and rid, mold/bacteria resistant <br />P g g­11-111 <br />355 <br />SF <br />$7.00 <br />$ 2,485.00 <br />Paint walls <br />750 <br />SF <br />$3.00 <br />$2,250.00 <br />Porcelain Tile Flooring <br />355 <br />SF <br />$14.00 <br />$4,970.00 <br />Solid Surface Countertops <br />15 <br />LF <br />$110.00 <br />$1,650.0 0 <br />Oil/grease separator <br />1 <br />EA <br />$5,000.00 <br />$5,000.00 <br />Food Disposer <br />-------- <br />........- <br />1 <br />_.,,,, .... _...,. <br />EA <br />... <br />$600.00 <br />--..... <br />$600.00 <br />_- <br />Triple Bay sink <br />1 <br />EA <br />$2,000.00 <br />$2,000.00 <br />Hand -washing sink <br />1 <br />EA .. <br />$..1,600.00.. <br />�$1,600.00 <br />........ <br />Piping <br />1 <br />LS <br />$1,500.00 <br />$1,500.00 <br />Electrical <br />LS <br />$1,500.00 <br />$1,500.00 <br />.. <br />LED Lighting <br />........... <br />8 <br />EA <br />$350.00 <br />$2,800.00 <br />Appliances <br />1 <br />LS <br />..... ....... <br />$3,500,00 <br />......... <br />$3,500.00 <br />.,.......... .,.,_ _ ...... <br />Subtotal <br />_ <br />,,, „ ..... <br />_,,,,,,,,,,,,,, ,,, <br />$53,455.00 <br />General Conditions <br />7% <br />$3,741.85 <br />General Contractor's Overhead & Profit <br />10% <br />$5,719.69 <br />........ ........ .... .. ......... ....... <br />Design Contingency <br />.. . <br />5% <br />$3,145.83 <br />Escalation <br />2% <br />$1,321.25 <br />Total Base Bid Estimate: <br />$67,383.61 <br />