Laserfiche WebLink
City of South Bend <br />118-077 <br />ummary of Probable Construction Cost <br />Pinhook Park Improvements <br />DLZ Project No. 1861-1578 <br />Description Quantityl Units I Unit Price I Total I Subtotals <br />DIV. 01 - GENERAL REQUIREMENTS <br />Mobilization/Demobilization 1 LS $19,721.913 $19,721.98 <br />Tree Protection Pre..,..... 1�.... .. ........ .... 7 <br />/ paration 1 LS $7,500 00 $ ,500.00 <br />Erosion Control 1 LS $11,833.19 $11,833.19 <br />Subtotal Div. 01 -General Requirements $39,055.16 <br />DIV. 02 - EXISTING CONDITIONS <br />Misc. Utility Adjustments <br />1 <br />LS <br />$2,500.00 <br />$2,500.00 <br />Tree Removal <br />---- <br />1 <br />-- .------------ <br />LS <br />....._._ ........ <br />$2,500.00 <br />$2,500.00 <br />-.....--------- <br />Pavement Removal <br />950 <br />.._ <br />SY <br />. <br />..... . ................. <br />$10.00 <br />........ <br />........ <br />..... <br />$9,500.00 <br />Remove OId Play Equipment at East......, <br />End <br />1 <br />LS <br />$1,500.00 <br />$1,____" ..... <br />Strip Turf an.... ....... ---- <br />d Topsoil <br />1097 <br />CYD <br />................� ........ <br />$3,839.50 <br />- ------ - ......... <br />........... ._ <br />Subtotal Div. 02 - Existing Conditions <br />$19,839.50 <br />DIV. 10 - SPECIALTIES (SIGNAGE) <br />Trailhead Signage and Kiosk 1 LS $5,000.00 $5,000.00 <br />Trail Mileage Markers 1 LS .�$2,000.00 $2,000.00 <br />....... ..... <br />Vehicular Wayfinding Signage 1 LS $1,500.010 $1,500.00 <br />........ <br />Subtotal Div. 10 - Specialties $8,500.00 <br />'. 12 - FURNISHINGS <br />Trailside Interactive Feature 1 <br />1 ._._ <br />LS <br />......... <br />$3,000.00 <br />$3,000.00 <br />...... - <br />Trailside Interactive Feature 2 <br />1 <br />LS <br />$2,500.00 <br />$2,500.00 <br />Trailside Interactive Feature 3 (See Div. 22 for Water) <br />1 <br />LS <br />$2,500.00 <br />$2,500.00 <br />.................... _ ..... -. <br />PicnL c Tables <br />0 <br />EA <br />$0.00 <br />By Owner <br />........ <br />Benches <br />4 <br />EA <br />$1,850.00 <br />$7,400.00 <br />.......... ...-- _ -------.._..... <br />Trash Receptacles <br />4 <br />EA <br />_. <br />$1,450.00 <br />... ...... .... <br />$5,800.00 <br />Concrete Pavement - 4" (Table Pads and Trailhead) <br />100 <br />SY <br />$60.00 <br />$6,026.67 <br />Subtotal Div. 12 - <br />Furnishings <br />$27,226.67 <br />