C. <br />d. <br />f. <br />Project Engineer, as directed by the Onwer, to assist in any matter that <br />may arise during the construction of the project. <br />B. Duration of Construction Phase: Duration of Construction is anticipated to be 16 <br />weeks. For purposes of this agreement, it is assumed DLZ shall spend an average <br />of eight (8) hours per week (total for all bid packages) including travel from DLZ's <br />office to the Project site to determine that the Project is advancing generally, in <br />accordance with the Contract Documents and advise the Client accordingly. <br />C. Limitation of Responsibilities: Engineer shall not be responsible for the acts or <br />omissions of any Contractor, Subcontractor or Supplier, or other individuals or <br />entities performing or furnishing any of the Work, for safety or security at the Site, <br />or for safety precautions and programs incident to Contractor's Work, during the <br />Construction Phase or otherwise. Engineer shall not be responsible for the failure <br />of any Contractor to perform or furnish the Work in accordance with the Contract <br />Documents. <br />The responsibilities of Owner are modified as follows: N/A <br />For the Additional Services or the modifications to services set forth above, <br />Owner shall pay Engineer the following additional or modified compensation: <br />Additional Project Management I I 800.00. <br />Add'l Survey $3�0 . <br />Preliminary Construction Document Phase $32�.i�0 <br />Final Construction Document Phase $42,600-00 <br />Permitting $10,400.00 <br />Testing $2200.00 <br />Bidding Assistance Phase �l 600.00 <br />Construction Phase $22,300.00 <br />The schedule for rendering services is modified indicated above. <br />Other portions of the Agreement (including previous amendments, if any) are <br />modified as follows: <br />• Amendment 1 Dated 1/8/2019 <br />• A2.01 Additional Services Requiring Owner's Written Authorization <br />32. Services related to execution of State Grant Agreement <br />33. Documentation required for LWCF grant closeout, including <br />but not limited to 6(f)3 boundary map, billing documents, and <br />recording documents for LWCF encumbrance. <br />Page 8 <br />(Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />