My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to PSA - American Structurepoint - Emergency Plaster Repair for MPAC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Amendment No 1 to PSA - American Structurepoint - Emergency Plaster Repair for MPAC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 1:18:00 PM
Creation date
4/10/2019 10:11:38 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
4/9/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT K, consisting of 2 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated November 27, 2018. <br />AMENDMENT TO OWNER -ENGINEER AGREEMENT <br />Amendment No. —1� <br />1. Background Data <br />a. Effective Date of Owner -Engineer Agreement: <br />b. Owner: Board of Public Works, City of South Bend, Indiana <br />C. Engineer: AmericanmStructurepoint Inc. <br />d. Project: Morris Center of Performin Arts Emergency Plaster Work <br />2. Description of Modifications: <br />a. Engineer shall perform or furnish the following Additional Services: <br />American Structurepoint will provide the consulting engineering services <br />required to assist the City of South Bend in producing bid documents and <br />construction administration services for the remedial repairs required at <br />the Morris Performing Arts Center. <br />b. The Scope of Services currently authorized to be performed by Engineer in <br />accordance with the Agreement and previous amendments, if any, is modified as <br />follows: <br />«► Development of bid documents including but not limited to: A performance <br />specification, sketches and descriptions of remedial repairs, general conditions <br />and/or other bid documents as required. <br />0 Attendance at pre -bid meeting, as deemed necessary <br />• Two inspections of the dome plaster to determine the extent of repairs required. <br />One inspection during and scaffold installation to keep on schedule and another <br />inspection once scaffold construction is complete. <br />• Communication and coordination as required with contractors during repairs. <br />One after completion of repairs to inspect final conditions. <br />C. The responsibilities of Owner are modified as follows: <br />d. For the Additional Services or the modifications to services set forth above, <br />Owner shall pay Engineer the following additional or modified compensation: <br />e. The schedule for rendering services is modified as follows: <br />Page 1 <br />(Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.