Laserfiche WebLink
E,,JCDCfg,.,...—,.. <br />ENGINEERS JOINT CONTRACT <br />DOCUMENTS COMMITTEE <br />AGRE EENT <br />BETWEEN OWNER AND ENGINEER <br />FOR. <br />PROFESSIONAL SERVICES <br />THIS IS AN AGREEMENT effective as of March 26 , 2019 ("Effective Date") between <br />Board of Public Works, City of South Bend <br />.........._ ,..Indiana ....................._................................ ("Owner") and <br />Shive-Hatte ("Engineer"). <br />Owner's Project, of which Engineer's services under this Agreement are a part, is generally identified as <br />follows: <br />t�j . <br />South Bend Fire Station Pre -Des> n Renovations 3 <br />Engineer's services under this Agreement are generally identified as follows: <br />Study and Report for predesign studies for the South Bend Fire Stations 3 and 6. Providing a basic <br />floor plan, Scope and MEP narratives and preliminary cost estimates for the scope as described in the <br />draft relimin sco a memo sent on 2/11/2019 <br />_. W.l? _ ....._'.. ... �......... <br />Owner and Engineer agree as follows: <br />ARTICLE 1— SERVICES OF ENGINEER <br />1.01 Scope <br />A. Engineer shall provide, or cause to be provided, the services set forth herein and in Exhibit A. <br />ARTICLE 2 — OWNER'S RESPONSIBILITIES <br />2.01 General <br />A. Owner shall have the responsibilities set forth herein and in Exhibit B. <br />B. Owner shall pay Engineer as set forth in Exhibit C. <br />Page 1 <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />C. All rights reserved. <br />�...—,. Copyright � w2008 National Society of Professional Engineers for EJCD............... . <br />