Laserfiche WebLink
2. Prepare Preliminary Design Layout plans for the purpose of determining construction limits <br />and right-of-way required for the lift station and forcemain relocation. Right -of -Way <br />acquisition services are anticipated to be completed as part of the Douglas Road <br />Reconstruction Project (see Item A1.01.7.e). <br />a. The preliminary layout/location of the relocated lift station is anticipated to be southeast <br />of the existing lift station on the Ponader Park property. <br />Prepare Preliminary Design Phase documents consisting of preliminary drawings and <br />outline specifications, and written descriptions of the project. <br />4. Utilize field surveys, topographic and utility mapping for design purposes obtained as part <br />of the Douglas Road Reconstruction Project. Engineer will supplement this information <br />with additional field survey.. <br />5. Advise Owner if additional survey, reports, data, information, or services of the types <br />described in Exhibit B are necessary and assist Owner in obtaining such reports, data, <br />information, or services. <br />6. Based on the information contained in the Preliminary Design Phase documents, prepare a <br />revised Opinion of Probable Construction Cost, and assist Owner in collating the various <br />cost categories which comprise Total Project Costs. <br />7. Perform or provide the following additional Preliminary Design Phase tasks. <br />a. Project Kick -off Meeting <br />1) An initial meeting will be held with persons designated by the Owner and the <br />Engineer. The objective of this meeting will be to introduce those persons who will <br />have principal responsibilities on this Project; and to review in general the <br />obligations of the Engineer and the Owner under this Agreement; including the <br />schedule of work, identify Project priorities and any related development activities, <br />required procedures for performance of the work, and review all available <br />background information about the work site. <br />b. Utility Coordination <br />1) Utility coordination will be conducted in accordance with Chapter 104 of the <br />Indiana Design Manual by the Engineer as part of the Engineer's agreement with St. <br />Joseph County for the Douglas Road Reconstruction project. Engineer will review <br />utility relocation plans for compatibility with proposed improvements and other <br />utility relocation plans. The Engineer will supplement this information with <br />additional coordination relative to the lift station construction. Subsurface Utility <br />Engineering (SUE) investigation for the proposed lift station and force main is not <br />included in this agreement. <br />c. Field Survey <br />Page 2 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />