My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - DLZ Indiana LLC - Douglas Road Lift Station
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Professional Services Agreement - DLZ Indiana LLC - Douglas Road Lift Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 2:09:11 PM
Creation date
3/27/2019 2:01:09 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
3/26/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
,.EJ'CD C <br />ENGINEERS JOINT CONTRACT <br />DOCUMENTS COMMITTEE <br />AGREEMENT <br />.BETWEEN OWNED.. AND ENGINEER <br />FOR <br />PROFESSIONAL SERVICES <br />THIS IS AN AGREEMENT effective as of 3/26 2019 ("Effective Date") between <br />City of South Bend acting by and through the Board of Public Works ("Owner") and <br />DLZ Indiana, LLC, 2211 East Jefferson Blvd. South Bend, Indiana 46615 ("Engineer"). <br />Owner's Project, of which Engineer's services under this Agreement are a part, is generally identified as <br />follows: <br />DOUGLAS ROAD LIFT STATION RELOCATION ("Project") <br />............... <br />Engineer's services under this Agreement are generally identified as follows: <br />Professional engineering services for the City's relocation of the Douglas Road lift station and sanitary <br />sewer forcemain due to conflicts with the Douglas Road Reconstructions Project Des. No. 1400639 <br />project, which includes added travel lanes and bridge reconstruction from Ivy Road to S.R. 23. The <br />Douglas Road lift station relocation will be incorporated into the construction documents as appropriate <br />for the Douglas Road Reconstruction project phases. The overall scope of the Douglas Road <br />Reconstruction project is anticipated to be separated into two construction contracts. Phase 1 includes <br />the Douglas Road / Ironwood Road intersection and the Douglas Road and Ironwood Road bridges <br />over Juday Creek. Phase 2 is anticipated to include road reconstruction from Ivy Road to <br />approximately 900 feet west of Ironwood Road, and from the Douglas Road bridge over Juday Creek <br />to SR 23. <br />The existing Douglas Road lift station pumping capacity is 1,250 gallons per minute (gpm) and the <br />existing 10" forcemain located under the proposed Douglas Road lane additions is approximately 2,700 <br />feet in length. <br />The existing lift station will be replaced with a submersible duplex pump station with an automatic <br />transfer switch and plug for portable generator connection. An on -site emergency generator will be <br />included as an alternate bid item. The proposed lift station will include submersible pumps having the <br />same flow rate, total dynamic head and horsepower design parameters as the existing pumps. The <br />existing lift station will be maintained in operation until the new lift station is operational. The existing <br />lift station will be abandoned and demolished. <br />The sanitary sewer relocation will consist of approximately 2,700 lineal feet of 10-inch forcemain <br />relocation, addition of pressure relief valves where required, and approximately 150 lineal feet of 12- <br />inch gravity sanitary sewer pipe and manholes. Refer to Exhibit A, Figure No. 1 for the Project Limits <br />Map. <br />Page l <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.