Laserfiche WebLink
DocuSign Envelope ID: DF6AA6FA-1 DAD-4DBC-91 95-DC507E7C3EB9 <br />A1.04 Final Design Phase <br />A. After acceptance by Owner of the Preliminary Design Phase documents, revised opinion of <br />probable Construction Cost as determined in the Preliminary Design Phase, and any other items <br />subject to any Owner -directed modifications or changes in the scope, extent, character, or design <br />requirements of or for the Project, and upon written authorization from Owner, Engineer shall: <br />1. Prepare final Drawings and Specifications indicating the scope, extent, and character of the <br />Work to be performed and furnished by Contractor. <br />Provide technical criteria, written descriptions, and design data for Owner's use in filing <br />applications for permits from or approvals of governmental authorities having jurisdiction <br />to review or approve the final design of the Project; assist Owner in consultations with such <br />authorities; and revise the Drawings and Specifications in response to directives from such <br />authorities. <br />Advise Owner of any adjustments to the Opinion of Probable Construction Cost (AACE <br />class 1), known to Engineer. <br />4. Prepare and furnish bidding documents for review by Owner, its legal counsel, and other <br />advisors, and assist Owner in the preparation of other related documents. <br />5. Conduct in -person review meeting with Owner. <br />6. Within five (5) business days of review meeting, Owner shall submit to Engineer any <br />comments and, subject to the provisions of Paragraph 6.01.G, instructions for revisions. <br />7. Revise the bidding documents in accordance with comments and instructions from the <br />Owner, as appropriate, and submit one final electronic copy of the bidding documents, a <br />revised opinion of probable Construction Cost, and any other deliverables to Owner five (5) <br />business days after receipt of Owner's comments and instructions. <br />B. Engineer's services under the Final Design Phase will be considered complete on the date when the <br />submittals required by Paragraph A1.03.A.6 have been delivered to Owner. <br />C. In the event that the Work designed or specified by Engineer is to be performed or furnished under <br />more than one prime contract, or if Engineer's services are to be separately sequenced with the <br />work of one or more prime Contractors (such as in the case of fast -tracking), Owner and Engineer <br />shall, prior to commencement of the Final Design Phase, develop a schedule for performance of <br />Engineer's services during the Final Design, Bidding or Negotiating, Construction, and Post - <br />Construction Phases in order to sequence and coordinate properly such services as are applicable to <br />the work under such separate prime contracts. This schedule is to be prepared and included in or <br />become an amendment to Exhibit A whether or not the work under such contracts is to proceed <br />concurrently. <br />D. The number of prime contracts for Work designed or specified by Engineer upon which the <br />Engineer's compensation has been established under this Agreement is one. If more prime contracts <br />Page4 <br />(Exhibit A — Engineers Services) <br />EJCDC E-500 Agreement Between Owneand Engineer for Professional Services <br />Copyright D 2008 National Society of Professional Engineers for EJCDC. All rights reserved.. <br />