My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Technology Resource Center Project No 118-090 - Woodcox Building Contractor Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - Technology Resource Center Project No 118-090 - Woodcox Building Contractor Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 11:26:06 AM
Creation date
3/27/2019 1:43:56 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/26/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Commercial — Design/Build — Remodeling <br />Re: Part II Section II, 1. <br />51175 Prescott Avenue <br />South Bend IN 46637 <br />Phone (574) 272-6905 <br />Fax (574) 277-9892 <br />April 8 <br />• Pre -construction meeting <br />• Mobilize <br />April 9 <br />• Layout Begins <br />• Underground Material drop-off <br />April 11 <br />• Underground Begins <br />• Curtain wall removal for earthwork/vapor barrier/concrete <br />• Temp wall constructed <br />April 29 <br />• Geo-Seal install begins. MTN, Inc. provided availability to start upon acceptance <br />with 2 weeks notification prior to work. <br />May 6 <br />• Concrete prep/placement- Premium Concrete agreed to availability <br />• Densifier applied to unpolished areas and polished areas if Alt. 2 is applied to the <br />proj ect <br />May 20 <br />• Layout/Framing begin <br />• Fire Protection <br />May 27 <br />• Mechanical/plumbing/electrical rough ins begin <br />June 10 <br />• Drywall <br />June 24 <br />• Finishers begin <br />July 8 <br />• Ceiling Systems <br />July 15 <br />• Electrical/HVAC/Fire suppression ceiling drops <br />August 12 <br />• Floor polishing <br />August 26 <br />• Final paint <br />• Carpet <br />
The URL can be used to link to this page
Your browser does not support the video tag.