Laserfiche WebLink
Commercial — Design/Build — Remodeling <br />Re: Part II Section II, 1. <br />51175 Prescott Avenue <br />South Bend IN 46637 <br />Phone (574) 272-6905 <br />Fax (574) 277-9892 <br />April 8 <br />• Pre -construction meeting <br />• Mobilize <br />April 9 <br />• Layout Begins <br />• Underground Material drop-off <br />April 11 <br />• Underground Begins <br />• Curtain wall removal for earthwork/vapor barrier/concrete <br />• Temp wall constructed <br />April 29 <br />• Geo-Seal install begins. MTN, Inc. provided availability to start upon acceptance <br />with 2 weeks notification prior to work. <br />May 6 <br />• Concrete prep/placement- Premium Concrete agreed to availability <br />• Densifier applied to unpolished areas and polished areas if Alt. 2 is applied to the <br />proj ect <br />May 20 <br />• Layout/Framing begin <br />• Fire Protection <br />May 27 <br />• Mechanical/plumbing/electrical rough ins begin <br />June 10 <br />• Drywall <br />June 24 <br />• Finishers begin <br />July 8 <br />• Ceiling Systems <br />July 15 <br />• Electrical/HVAC/Fire suppression ceiling drops <br />August 12 <br />• Floor polishing <br />August 26 <br />• Final paint <br />• Carpet <br />