My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Technology Resource Center Project No 118-090 - Majority Builders Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - Technology Resource Center Project No 118-090 - Majority Builders Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 11:24:29 AM
Creation date
3/27/2019 1:42:51 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/26/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Name: <br />Project Number: <br />For Bids Due: <br />Contractor Name: <br />ALTERNATE NO.4 <br />BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Technology Resource Center <br />118-090 <br />March 26th, 2019 at 9:30 AM Local Time <br />oritv Builders. Inc. <br />Item <br />Description <br />Quantity <br />Unit <br />Total Amount <br />No. <br />1 <br />Provide a deduct price to furnish and install Corian solid surface <br />1 <br />SF <br />$-3, 691.00 <br />vanity top in lieu of Corian quartz vanity top. <br />TOTAL BASE BID <br />$-3, 691.00 <br />ALTERNATE NO. 5 <br />Item <br />Description <br />Quantity <br />Unit <br />Total Amount <br />No. <br />Provide a deduct price to furnish and install hollow metal office <br />1 <br />storefront system with painted finish in lieu of C.R. Laurence Series <br />1 <br />LF <br />$+11 389.00 <br />' <br />487 aluminum office storefronts stem. <br />TOTAL BASE BID <br />$+11,389.00 <br />ALTERNATE NO. 6 <br />Item Description Quantity Unit Total Amount <br />No. <br />Provide new electrical service as shown on Sheet E3-106 for <br />future tenants A,B, and C. All lighting fixtures, power devices, and <br />1 circuiting to the associated panels as shown on the electrical floor 1 LS $+30, 887.00 <br />plans shall be part of this work. Any structures required to support <br />the new electrical service to match existing to also be part of this <br />work. <br />TOTAL BASE BID a $+30,887.00 <br />PER ADDENDUM 18: <br />FURNISH AND INSTALL COMPACTED FILL TO SUPPORT THE SPECIFIED 4"SLAB DEPTH. <br />ADD: $ 9,505.00 <br />Version 8/16/2018 Special Provisions - 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.