My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - Miami Street Basin Drainage Improvements Project No 116-082C - HRP Construction Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 1 - Miami Street Basin Drainage Improvements Project No 116-082C - HRP Construction Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:48:18 PM
Creation date
3/27/2019 1:17:06 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/26/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND, INDIANA <br />DEPARTMENT OF PUBLIC WORKS <br />PROJECT CHANGE ORDER <br />DATE: <br />PROJECT NO: <br />PROJECT NAME: <br />CONTRACT DATE: <br />CHANGE ORDER NO: <br />SUBJECT OF CHANGE ORDER: <br />2/11/2019 <br />116-082 C <br />MIAMI STREET BASIN DRAINAGE IMPROVEMENTS <br />8/14/2018 <br />1 <br />PCR #1-Add Line Item #36, MH Access Hatch, Halliday C1 R52 w/ <br />Safety Grate (1 LS; $3,860.00). Add Line Item #37, Seismic <br />,Monitoring for Pipeline 1 LS; $4,920.00 . <br />The original contract sum <br />Net change by previously authorized change orders <br />The contract sum prior to this change order <br />By this Change Order, the project amount is <br />The new contract sum including this change order <br />This Change Order represents a total change of <br />Total change for entire project <br />Original contracted completion date/time <br />Extension of date/time by previous change orders <br />Date/time extension by this change order <br />New completion date/time <br />Contractor Signature <br />Matthew D. Cain, President <br />Printed Name and Title <br />HRP Construction, Inc. <br />Company Name <br />5777 Cleveland Road <br />Address <br />South Bend, IN 46624 <br />City, State, Zip <br />$ 493000.00 <br />$ 0.00 <br />$ 493,000.00 <br />X Increased <br />Decreased $ <br />8,780.00 <br />$ <br />501,780.00 <br />1.78 % <br />1.78 % <br />12/24/2018 <br />0 days <br />139 days <br />..�. <br />5/12/2019 <br />V40161 1.1 <br />.�ION MANAGER <br />CITY OF SOUTH BEND <br />BOARD OF PUBLIC ORK S <br />Approved Date: , <br />Ga <br />Lat/ ' U,3c,,r� � I, Member <br />Eliabetl A. Maradik, Member <br />Therese J. D�o]^ <br />raau,Member <br />l� " " " <br />6�ai i !A41-.L 9OZ , Member <br />
The URL can be used to link to this page
Your browser does not support the video tag.