Laserfiche WebLink
REGULAR MEETING MARCH 12, 2019 51 <br />Osceola, IN 46561, in the amount of $4,782 for Base Bid, Division A. Mr. Klosinski is now <br />requesting the Board ratify the award. Therefore, Ms. Dorau made a motion that the <br />recommendation be accepted and the quotation be awarded as outlined above. Ms. O'Sullivan <br />seconded the motion, which carried. <br />RATIFY QUOTATION AWARD — ORGANIC RESOURCES FACILITY FLAGPOLE AND <br />INSTALLATION SERVICES — BASE BID DIVISION B UTILTIES ORGANIC <br />RESOURCES BUILDING REPAIR & MAINTENANCE <br />Mr. Jacob Klosinski, Wastewater, advised the Board that on April 24, 2018, quotations were <br />received and opened for the above referenced project. After reviewing those quotations and due <br />to the quote being below the $25,000 threshold, Mr. Klosinski awarded the contract to the lowest <br />responsive and responsible bidder, Martell Electric, LLC, 4601 Cleveland Rd., South Bend, IN <br />46628, in the amount of $4,501 for Base Bid, Division B. Mr. Klosinski is now requesting the <br />Board ratify the award. Therefore, Ms. Doran made a motion that the recommendation be <br />accepted and the quotation be awarded as outlined above. Ms. O'Sullivan seconded the motion, <br />which carried. <br />APPROVE CHANGE ORDER NO. 9 — ERSKINE CLUBHOUSE RENOVATION — PROJECT <br />NO. 116-108 EPA 'MAINTENANCE <br />Mr. Gilot advised that Mr. Kyle Silveus, Engineering, has submitted Change Order No. 9 on <br />behalf of Ziolkowski Construction, Inc., 4050 Ralph Jones Drive, South Bend, IN 46628, <br />indicating the contract amount be increased by $62,852 for a new contract sum, including this <br />Change Order, in the amount of $1,076,842. Mr. Gilot noted the project is nearing the 20% <br />increase limit but added Mr. Silveus explained that almost all of these situations were due to <br />unforeseen site conditions as excavation proceeded. Upon a motion made by Ms. Dorau, <br />seconded by Ms. O'Sullivan and carried, the Change Order was approved. <br />APPROVE CHANGE ORDER NO. 1 — FOUR WINDS FIELD LANDSCAPING <br />(COVELESKI NON -REVERTING) <br />Mr. Gilot advised that Mr. Patrick Sherman, VPA, has submitted Change Order No. 1 on behalf <br />of Foegley Landscape, Inc., 52215 N. Lilac Road, South Bend, IN 46628, indicating the contract <br />be increased by seventeen (17) days for a new contract completion date of April 1, 2019. Upon a <br />motion made by Ms. Dorau, seconded by Ms. O'Sullivan and carried, the Change Order was <br />approved. <br />APPROVE CHANGE ORDER. NO. 1 — THREE TWENTY AT THE CASCADE — SITE <br />UTILITIES — PROJECT NO. 118-074D (REDA TIF ) <br />Mr. Gilot advised that Mr. Zach Hurst, Engineering, has submitted Change Order No. 1 on <br />behalf of Indiana Earth, Inc., 10343 McKinley Highway, Osceola, IN 46561, indicating the <br />contract amount be increased by $18,295 for a new contract sum, including this Change Order, in <br />the amount of $186,767. Upon a motion made by Ms. Dorau, seconded by Ms. O'Sullivan and <br />carried, the Change Order was approved. <br />APPROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS — TWO (a, <br />MORE OR LESS 2019 OR NEWER 3✓4 TON EXTENDED CAB FOUR-WHEEL DRIVE <br />PICK-UP TRUCK'S -- SPEC A (SEWERS CAPITAL) <br />In a memorandum to the Board, Mr. Jeff Hudak, Central Services, requested permission to <br />advertise for the receipt of bids for the above referenced trucks. Therefore, upon a motion made <br />by Ms. Doran, seconded by Ms. O'Sullivan and carried, the above request was approved. <br />APPROVAL OF REQUEST TO ADVERTISE I^OR THE RECEIPT OF BIDS — TWO 2 <br />MORE OR LESS 2018 OR NEWER 27 CUBIC YARD SINGLE ARM SIDE LOADING <br />REFUSE TRUCKS — SPECB SOLID 'tih^'ASTE CAPITAL LEASE <br />In a memorandum to the Board, Mr. Jeff Hudak, Central Services, requested permission to <br />advertise for the receipt of bids for the above referenced trucks. Therefore, upon a motion made <br />by Ms. Doran, seconded by Ms. O'Sullivan and carried, the above request was approved. <br />