My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 9 - Erskine Clubhouse Renovation Project No 116-108 - Ziolkowski Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 9 - Erskine Clubhouse Renovation Project No 116-108 - Ziolkowski Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 1:04:07 PM
Creation date
3/12/2019 3:52:01 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/12/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ziolkowski Construction <br />4050 Ralph Jones Drive <br />South Bend, Indiana46(128 <br />AM,): Tini Mbrey <br />dLe-c <br />2021. N Merrifield <br />Mishawaka, IN 46545 <br />Fax (574) 855-3592 <br />Cell (574) 334-0259 <br />Quote #C 10569-5 <br />February 11, 2019 <br />Erskine Golf Course Club lJouse-Kitchen Feeder Rework. <br />Scu —,e qc—work <br />0 Derno Existing Kitchen Feeder that is loft handing and is not per NECa <br />4 The manner in that the conduit is now is a safety issue, <br />a We prcpose to rcinove this conduit and wire from the new electrical panel back to the <br />junction box that is directly below the panel. <br />0 The new beaker feeding this panel is a 100 amp, so we will install a 100 arnp Beeder <br />C� <br />which will reduce the size fioni a2l" to a 1 14". <br />• The new conduit will be installed per code and will make the physical appearzuicc <br />much better than it is presently, <br />• Labor 24 hours @ $X00 $1,680A <br />• Material $830.00 <br />0 Over Head and Profit 10% $25 1,00 <br />Not to Exceed <br />TWO Yhousand&nlen Hundred&rty One cold (loll 00 4jojj(ja,,� $2,761,00 <br />(Sales tav axcludc,4�) <br />Warranties <br />Fne.,inecring - Flite Electric %vill R gtiarantee its engincering fi-mn d6a cts fora 1,vriodof one year, <br />flardware— Manufacturer's wal-GUItics will �nIpply ten call eqifipment covered in 0iis propmal. <br />Elite Elcclric wilt 'lot replace or warrant damage due to negligence, vandalism or acts <br />ot'God <br />Limits of Proposal <br />Proposal considers the exisience of systeiri drawings to indicate oirrent accurate con rwnra, fion. <br />This proposal considers work boing done during normal working, hours. O/Tis n 0 <br />ot Covered by this proposal. <br />Delays by othorsacne not considered by this pr(,)f.xxsaL <br />This prop cos l donot collskler thelbihire, 0 , if existing hardware devices rejajjjjeaj dbr reuse. <br />Civility Costs of ariy son are, excl tiffed froi n t1ij is pro a] <br />CLating, patching, PailltiO&a is not ii'lChAdCd in this proposal. <br />Paige 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.