Laserfiche WebLink
"rim 01,,e <br />From- jbucher@ejwhiteinc.net <br />Sent: Saturday, January 26, 2019 12:19 PM <br />To, Tim Morey <br />Subject: RE: Erskine Clubhouse <br />Attachments: Quote - Stalkers - Alt. #1 & #2 Increases (With EJW M,U.),pdf <br />Importance: High <br />MR <br />Please see attached. Per you-'rrecWest, the following are cost increases associated with post -bid acceptance of <br />a an add on here for additional paintgrill-asseciatffwith Alternate #2, We <br />n <br />need a response back ASAP confirming that it i <br />Alternates #1 & #2. Note that the <br />re that tilskerinates and„ priee-irref6ses were accepted (the paint grip can <br />wait). We are getting ready to install Un'q=ro-wnd,TNd_nqed to know for rough. -ins and drains: <br />All'67MM — Lower Level Restroorns <br />The increases in plumbing for this alternate result from the plumbing fixtures . . . ......... . ....... <br />4% ures and cppperplj�ing-, The increase in HVAC <br />comes fro rri1RKTd_U"ffiat two exhaust grilles need to be purchased since t h&tvV6—'gri lies the alternate stated to delete <br />were already order tuns ice the alternate was not accepted t' he <br />* - b 6ginningofthe job. The grilles cannot be returned. <br />Labor, $01 NS�SN <br />Cop <br />per . <br />a Pipe & Fittings."$47 3), <br />® Plumbing Fixtures-, <br />* E. J. White J,55,98'6ass Material M;'kqyp: $53.61 <br />1� <br />St-1 er Sheet Metal: $86.00 <br />J. White 101 Gross Subcontractor -Marie '_Ur��'.'sa5ls <br />AdditiDna1Add fbrA1ternate#1: +$452,93 <br />The increases in plumbing for this alternate result from the plumbing fixtures and copper piping. The increase in HVAC <br />comes from the fact that one barrel diffuser on the spiral duct that was supposed to be eliminated with the alternate at <br />the beginning of the project has already been purchased. One new diffuser needs to be purchased for the bar area. The <br />base bid grille cannot be returned. <br />• Labor: $0 <br />• Copper Pipe & Fittings: $21.93 <br />• Plumbing Fixtures: $76.18 <br />• E. J. White 15% Gross Material Mark -Up: $17.32 <br />• Stalkers Sheet Metal: $153.00 <br />• E. J. White 10% Gross Subcontractor Mark -Up., $17.00 <br />ill iiiijill''111111111111 <br />