My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 4 - Fire Station No 9 Project No 116-012 - Ziolkowski Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 4 - Fire Station No 9 Project No 116-012 - Ziolkowski Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:58:47 PM
Creation date
2/26/2019 1:14:37 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/26/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AIA <br />Document G701 TM -2017 <br />Change Order <br />PROJECT: (Name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: <br />17398 - Fire Station Number 9 Contract For: General Construction Change Order Number: 004 <br />2108 Mishawaka Avenue Date: March 13, 2018 Date: February 8. 2019 <br />South Bend, IN 46615 <br />OWNER: (Name and address) <br />City of South Bend <br />Board of Public Works <br />227 West Jefferson Blvd <br />South Bend, IN 46614 <br />ARCHITECT: (Name and address) <br />EPOCH Architecture + Planning <br />300 West Jefferson Blvd <br />South Bend, IN 46601 <br />CONTRACTOR: (Name and address) <br />Ziolkowski Construction, Inc. <br />4050 Ralph Jones Drive <br />South Bend, IN 46628 <br />THE CONTRACT IS CHANGED AS FOLLOWS: <br />(Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments <br />attributable to executed Construction Change Directives) <br />RCO #011 - Change to provide masonry sealer and anti -graffiti coating = Add $8,825.00 <br />RCO #012 - Change to provide base cabinet, TV wall box, dry erase board relocation and removal of dishwasher and <br />furnishings = Deduct $9,994.00 <br />RCO #013 - Change to remove the wardrobes and nightstands = Deduct $21,588.00 <br />The original Contract Sum was $ _052,,500.00 <br />The net change by previously authorized Change Orders $ 15,359.00 <br />The Contract Sum prior to this Change Order was $ 3,667,859.00 <br />The Contract Sum will be decreased by this Change Order in the amount of $ 22 757.00 <br />The new Contract Sum including this Change Order will be $ 3,645,102.00 <br />The Contract Time will be increased by Zero (0) days. — 0. 4 L % -TNi& C. 0 , <br />The new date of Substantial Completion will be t , psq */a Ta-rw� <br />NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract <br />Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the <br />Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. <br />NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. <br />EPOCH Architectur ;, <br />ARCHITE el°rra r) <br />SIGNAT <br />(PRINTED NAME AND TITLE <br />,. / 9 <br />DATE <br />Ziolkowski Construction, Inc. City of South Bend Board of Public <br />Works <br />CONTRACTOR ('Firin name) <br />S GNATURE <br />OWNER (Firm name) <br />SIGNATURE ea-rd of Pula.Pulaic varkS <br />Bill Favors, President & CFO <br />PRINTED NAME AND TITLE PRINTED NAME <br />February 8, 2019 <br />DATE DATE <br />AIA Document G701 TM — 2017. Copyright © 1979, 1987, 2000 , 2001 and 2017 by The American Institute of Architects. All rights reserved. Y�kttAll IIQNGw "'II'lill nr <br />AINA'' It9auw.nnimr.irrf iinw Ipirawtau;P:eat Ilfy N Pf. Cm IpYmutptnt IL.anns awirwaa Ilirnt:anarn�aurnawnnat "'Iflrrnafiiaa. Numsmmur,tunirIPxaat nellu nraan,urmtmmr>�� rcair wtu„,t:miin.uft'w�sirn r�wf fl:hlis AIIA""'' t:'tw�na,:uuirmu*irrt:, arir° <br />any Ipointion of lit:,, may iresuit mrn severe cilvill ;aimed a.m°ni ydi nail Ileum lltigs, and wiillll be prosecuted to the maxiNn iiuirn extent Ilpos ilbIle a nateir the (law. This <br />document was produced by AIA software at 15:21:29 ET on 02/08/2019 under Order No. 1093394963 which expires on 07/05/2019, and is not for resale, <br />User Notes: (3B9ADA5A) <br />
The URL can be used to link to this page
Your browser does not support the video tag.