My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6A (3)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2012
>
08-16-12 Packet
>
6A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 9:48:28 AM
Creation date
8/13/2012 1:43:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NOTE: <br />ABOVE PRICING INCLUDES ALLOWANCES OF $12,000.00 FOR ELECTRICAL WORK <br />AND $14,000.00 FOR WOOD WORK AS DESCRIBED BELOW. UNTIL WHICH TIME FIRM <br />PRICING HAS BEEN SOLICITED FROM OUTSIDE SOURCES, PRICING RELATIVE TO <br />THESE ITEMS ARE SUBJECT TO REVISION. <br />Electrical Allowance includes, but is not limited to the following: <br />• Installation of Lift Motor Control Cabinet in locked storage room and Lift Control Station <br />at DS Right CMU proscenium wall. <br />• Wire, conduit and terminations for providing incoming 50A, 480V power to Lift Motor <br />Control Cabinet <br />• Conduit runs and control & power wiring from Lift Motor Control Cabinet in locked <br />storage area to the following locations: lift pit J.B., interlocked doors J.B.s, daisy chain <br />interlocked closure panels J.B., interlocked audience railings J.B & Control Station @ DS <br />Right proscenium wall <br />• Two (2) 6 pole, 30A, NF disconnects for Lift Brake /Motors <br />• Control and Power Wiring Terminations at the Lift Motor Control Cabinet, all J.B.s, <br />motors (2), pit disconnects (2) and Control Station <br />• Installation of peripheral safety systems components including Shear Protection System, <br />Door interlock switches, access hatch interlock switch, Daisy Chain S.O. sections at <br />Closure Panels, Daisy Chain S.O. sections at Audience Railings. <br />Wood allowance includes, but is not limited to the following: <br />• Y2" Neoprene pads at V -0" CC (ea) 300 @ $2.00 = $600.00 <br />• Sub -floor 2 layers Y2" ply (sheets) 35 @ $50.00= $1,750.00 <br />• 5/4 T &G Hardwood Finish Floor (sf) 400@ $20.00= $8,000.00 <br />• Finish Hardwood Flooring (sf) 400@ $3.00= $1,200.00 <br />• Wood Ledgers (2) (If) 224@ $5.00 $1,120.00 <br />• Wood Finish at platform & guides (If) 112@ $10.00 $1,120.00 <br />NOTE: Actual thickness of wood floor system is yet to be determined. Thickness of <br />flooring system will be limited to allowable dimension to achieve the 30" pit depth. <br />Thank you for the opportunity to furnish this Firm Proposal. Please contact us if you have <br />questions or comments. <br />Regards, <br />Bruce Downer <br />SERAPID INC <br />SERAPID, INC 5 <br />5400 18 Mile Road Internet: www.serapid.com Tel: (586) 274 -0774 <br />Sterling Heights, MI 48314 Mail: info- us(ci)serapid.com Fax: (586) 274 -0775 <br />
The URL can be used to link to this page
Your browser does not support the video tag.