Board met in regular session at 10:00 A.M. All members present.
<br />Bids were received, opened and read for the following improvemente.
<br />Pavement on '�Penger �& �Carroll Streets.
<br />Bid of Williston Construct ion Cs�mpany, . • � • � .
<br />Cement curbper lin f •�35
<br />•. .. ... ., ... ....... , .... .
<br />Gradin.$, per cu. yd.... ............................ .80
<br />Asphalt pavement, ,using ,Standar.d Mexican 'Asphalt
<br />per sq.,,yd........................:: 2.54
<br />Asphaltic concr-te, per sq. yd....................... 2.19
<br />8 Inch conduit per�lin ft............................ .80
<br />Storm Water Inlets, each ............................. 10.00
<br />Marg. Curb, per'1in ft..............................0.• ;5
<br />Resetting. inlets, each.......... 2.50
<br />Resetting manhole; curbs and covers each .............. 2.50
<br />Check for $356.00
<br />Bid of The Western Construction Company.
<br />Cement curb, per lin ft .............................. .30
<br />Grading per cu. yd................................... 75
<br />Asphalt_, using Trinidad Zkket Asphalt , per sq
<br />. yd.. 2.63
<br />Asphaltic concrete, per sq. yd....................... 2.35
<br />Conduit, per lin ft................................. .80
<br />Sturm water inlets, each ............................. 9,0
<br />Marginal curb, per lin ft...,......................... .25
<br />Resetting inlets, each ......................0......... 2.00
<br />Resetting storm water grates, each ................... 2.00
<br />Certified check $ 256.00
<br />MAVEMENT O;vT MIDI STREET.
<br />Bid of the Western Construction Company.
<br />Cement, curb, per lin ft ................
<br />Grading per cu. yd..................................
<br />.30
<br />Comb inat ion curb and gutter, per lin. ft......... , , .
<br />.75
<br />/0
<br />No. 26 curb and inlets each .........................16.00
<br />.
<br />Asphaltic concrete, per sq. yd.......................
<br />2.35
<br />8 inch conduit pipe, per lin ft.....................
<br />Storm water inlets, each
<br />_80
<br />............................
<br />9.00
<br />Marginal curb, per lin ft...........................
<br />.25
<br />Resetting inlets, each ....................
<br />2.00
<br />Resetting manholes, curbs and covers, each.........
<br />2.00
<br />Certified check $ 454.00
<br />Bid of the White Construction Company.
<br />Cement curb, per lin ft............................
<br />.75
<br />Asphalt, Trinidad Lake Asphalt... per sq yd........
<br />2.62
<br />Grading per cu. yd.........................
<br />.......
<br />Asphaltic concrete, per sq. yd.....................
<br />.85
<br />2.37
<br />8 inch conduit pipe, per lin ft....................
<br />Storm water inlets, each ...........................
<br />.80
<br />15.00
<br />Marginal curb, per lin ft.,
<br />...............
<br />Resetting inlets, each
<br />.30
<br />..............................
<br />Resetting manhole, curbs and covers, each....... .,,,
<br />2.90
<br />4.00
<br />Certified check for 0 454.00
<br />
|