My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/04/1918 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1918
>
09/04/1918 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 12:53:14 PM
Creation date
2/14/2019 1:12:38 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
9/4/1918
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2'9'S <br />South Bend, Ind. Aug. 219191m.' <br />Board of. Public Works, <br />South Bead, Ind Tana. <br />Gentlemen: - <br />I hereby agree tof$rnish and install the required amount of rad iat ion <br />in your police locker room and detective office, also connect radiator now in hall for <br />the sum of seven. hundred %nd sixty* five dollars: (765. 00). - <br />The covering of the pipes in the police squad room or in the police petrol <br />^room I will cover for the sum of one hundred and seventy-five ($175). <br />Everything will be done in first-class workleanship.and guaranteed to heat <br />at the 70 degrees-. <br />Bid of Wm. H. Burke. <br />Board of Public Works, <br />South Bend, Indiana. <br />Yours respectfully, <br />JOE A: LUTHER. <br />per G.F. <br />Aug. 28,1918; <br />Gentlemen: - <br />I hez�ewith' bend'reu° �h�' ert imates for furnishing for the locker room ever <br />old stable 200 dq. ft' 'bf`ditbet'tidittier.°divided ifito 5 radiators 3 Col. 38. high <br />of 40 sq.. ft. in. each'Radi.ator, , together°with Valves, Air Valves, and the re- <br />arrangement of piping. <br />Taking my ma -in lire from the present 2" riser now in stable and running <br />a e iVeuit main on ceiling ° of ° stable °with ° openings fbr each rat4ator. This main Drip <br />to be covered with is , thick ° air ° eell < asbestos sectional covering and new connection' <br />ipade to the present radiators now located in stable an east end of building. <br />Connect up the raditer now on hand to be placed in the hall running east <br />and west on 2nd. floor snd make proper steam connections. Take`opening off the <br />2Jg" steam main located in patrol room, and extend same through wall and on ceiling <br />of locker room now used as storage. <br />.Furnish one 60 sq. ft. 3 Col. 38" high radiator same to be placed in the <br />hall just west and running north from locker roam together with ill pipe, fittings, <br />valves, air valves, labor, Bronzing and covering for the sus of seven hundred Seventen <br />(0717.00)Dollars. ° <br />. . <br />Yours truly, <br />W. H. BURKE <br />Pose - <br />Should you wish to cover the present main steam line suspended from ceil- <br />ing of the patrol room, I will furnish and put in place the proper size air - <br />cell -asbestos sectional covering as follows:--- ° <br />3" at 30 eta. per running foot. ' <br />4" at 27 eta. per running foot. - <br />2" at 24 eta. per running foo t. <br />11" at 22 eta. per running foot <br />1 at 21 eta. per runnier; foot. <br />1 at 20 eta. per running foot. <br />Asbastsr cement for covering the fittings on the steam maim at 6 eta., <br />per lb. ° <br />
The URL can be used to link to this page
Your browser does not support the video tag.