My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/02/1918 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1918
>
07/02/1918 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 12:42:07 PM
Creation date
2/14/2019 11:28:08 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
7/2/1918
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
20'130 <br />TRUNK SEWER IMPROVEMeITT RESLUTION NO. 580. <br />_ o <br />RESOLVED by the Board.of Public Works of the City of South Bend, County <br />of St. Joseph, State of Indiana; That it ie desired and deemed necessary to construct <br />a'Trunk sewer in Wilbur Street and'Thempeoa Street from Portage Avenue to Brookfield <br />Street and lateral sewers in Stocker Place from the center line of Portage Avenue to <br />the westerly line of Portage Avenue, Wilbur Street from Thompson Street t- Heller <br />Street and College Street from Hamilton Street to Keller. Street, known as the Marquette <br />Park Trunk Sewer System all in said City, which, from it size and cuaracter, is net <br />only intended and adapted for use by property owners whose property abuts along the <br />line of said sewer, but is also intended and adapted for receiving seweage from <br />collateral drains already constructed or which may be hereafter constructed, and the <br />same is hereby ordered constructed in and along the following line in said City,tow-it <br />Beginning at the intersection of the center line of Portage Avenue and Wilber Street; <br />thence south westerly and south along the center line of said Wilber Street to the. <br />center line of Thompson Street -with a 30 inch vitrified pipe sewer; thence west along <br />the center line of Thompson Street to the center line of College Street with a 30 inch <br />vitrified pipe sewer; thence still west along the center line of Thompson Street to the <br />center line of Brookfield Street with a 24 inch vitrified pipe sewer. Also begin <br />at the intersection of the center line of Thompson Street and College, Street; thence <br />north along the center line of College' Street to the south line of Hamilton Axaanxe <br />Street with a 10 inch vitrified pipe sewer. A13o begin at the intersection of the <br />center line of Thompson Street and College Street; thence south along the center <br />line of College Street to the center line Of Keller Street with a 10 inch vitrified <br />pipesewer. Also begin at the intersection of the center line of. Thompson Street and. <br />Wilber Street; thence south along the center lineof Wilber Street to the center line <br />of Keller Street with a 10 inch vitrified pipe sewer. Also begin at the intersection <br />Of the center line of Portage Avenue and Stocker Place; thence westerly along the <br />center line of Stocker Place to the westerly line of Portage Avenue with a 10 inch <br />vitrified pipe sewer. Together with the necessary manholes, storm water inlets:, <br />conduits, flush tanks and'house connections to the curb line along the line of said <br />improvement, all as is more particularly shown, and all in accordance with the pro-,- <br />files, plans, detail drawings and specifications on file in the office of the Depart - <br />meat of Public Works of the City of South Bend, Indiana,, <br />And to be built in accordance with the profiles, specifications, detail <br />plans, maps and estimates now on file in the office of the Department of Public Works <br />of s id City, which includes an estimate of the propost ion th t the cost of an <br />adgquate local sewer, built along th above -line, bears to the cost of the -main sewer, <br />to be built as follows:- The cost of an adWquadeelocal sewer, built along the line <br />described, is hereby estimated and fixed to be I of the cost <br />of the main sewer to be built along said line as above set forth, which proportion <br />as herein estimated and fixed, shall be taken and adopted in all computations requiring <br />a knowledge of the cost of such local sewer if built along the line where the main <br />sewer is to be built. The cost of the construction of said sewer shall be d iv ided as <br />follows:- <br />L. So much of such cost as shill be equivalent to the construction of <br />an Adequate local sewer not adopted to receive sewage from collateral drains or'sewers <br />,if built along.the proposed lines as hereinabove set forthm shall be paid'by the abut <br />ting property holden and the City of South Bend, ` if it be determined that said City <br />Is benefitted by said sewer in the same manner and to the same ipxtend as local sewers, <br />are paid for by them under the Statutues do such cases made and provided. <br />2. The excess of cost and abov a what would be equivalent to the <br />cost of a local sewer, if built along said Line, shall be assessed against each pieve <br />of property in the district it area to be drained and against the City, if it be. <br />determined that the said City if benefited by the said sewer, according to the manner <br />and method prescribed by law, all of which said property beneficially affected lies <br />within the -following described territory in the City of Soub Bend, County of St. Joseph <br />and State of Indiana, to -wit:- <br />
The URL can be used to link to this page
Your browser does not support the video tag.