My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/30/1918 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1918
>
04/30/1918 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 12:31:31 PM
Creation date
2/14/2019 10:20:26 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
4/30/1918
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
17`1 <br />Bid of Williston Construction Company. <br />curb, per lin ft.. .. �.. ...............35 <br />Grade, per cu. yd....•.,.........•................. .71 <br />Asphalt pavement per sq.. yd. ......................0.2 12 <br />For relaying brick pavement at Portage Avenue, per qq. yd $1.00 <br />phalt lc _,' c ncrete paNivemetti using Natural make, <br />Asphalt, per sq. yd...i•.••.r••.••••••. „ •.•••••.• $1.94 <br />8" conduit pipe, per lin ft ........... ^088 <br />Storm water islets, each... .....:•............... 8.50 <br />Marginal cement curb, per lin ft............... .35 <br />Resetting inlets, each..•.•....• ...:................. 2.00 <br />Resetting manholes covers, each .......... 2.00 <br />Bids were received opened and read bor pipe sewer sewer on St. Vicent <br />Street from Eddy Street to 120 feet east of Notre Dame Avenue <br />Bid of Bruno De Pespe. <br />12 inch Pipe, per lin ft............................. <br />2.19 <br />8 inch pipe sewer, per lin ft....................•. <br />.65 <br />6 inch pipe sewer, per lin ft...-................... <br />.85 <br />Vanholes, per ft. in.depth.,.,...•......•.......... <br />.6.50 <br />Manholes, curbs and covers, each .... .............. <br />15.00 <br />Storm water islets, complete ....................... <br />.8.00 <br />Bid of Hoban & Reach. <br />12 inch pipe sewer, per lin ft................�,,.. <br />1.70 <br />8 inch pipe sewer, per li.�t ft...•................. <br />.65 <br />6 inch pipe sewer, p r lira ft..................... <br />.75 <br />Storm water inlets, each .......................... <br />7,50 <br />Manholes, per ft. in depth. <br />5.00 <br />Manholes, curbs and covers, each.......•.......... <br />14.00 <br />Bid of Staples & Ackerman. <br />12 inch pipe sewer, per lin ft.... ............... <br />1.80 <br />8 inch pipe sewer, per Iin ft.............:.. ... <br />.$0 <br />° 6 inch pipe sewer, per lin ft................'.... <br />.80 <br />Manholes, curbs and covers, each ...............:. <br />13.10 <br />Manholes, per ft. is dtphh..........•......... <br />6.00 <br />Storm water inlete, each......................... <br />7.00 <br />All of the above bids referred to -the City Engineer <br />for tabulation <br />to be reported on at 1:30 P.M. this 30th., day of April 1918. <br />Bids received as follows on Asphalt repair work in the <br />City for the w <br />year of 1918. ° <br />Bid of H. N. Barnes. <br />Asphalt top per sq. yd .............................•• <br />2.15 <br />Goicrete base, -per sq. yd.... ...................... <br />.60 <br />$ id ofL. H. VanderKarr. : <br />Asphalt surface per sq, yd...............:........•..$2.20 <br />Concrete base, per sq. yd........................... <br />60 <br />this is the same 'price as last year on asphalt surface but l5cen.ts <br />increase in bane to meet the increased cost of cement and gravel. <br />The awarding of contract deferred until 1:30 P.U, this 30th. , day of <br />Apr it-o 19184-- - --- -- - --- <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.