My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Supplemental Agreement No 2 - United Consulting - APA Costs and Phase II Environmental Assessment for Coal Line Train Phase I
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Supplemental Agreement No 2 - United Consulting - APA Costs and Phase II Environmental Assessment for Coal Line Train Phase I
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 9:12:06 AM
Creation date
2/12/2019 4:20:54 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
2/12/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This SUPPLEMENTAL AGREEMENT ("Agreement') is made and entered into on this date Feb 12 , by <br />and between the City of South Bend, acting by and through its proper officials, CTOCAL PUBLIC AGENCY" <br />or "LPA'� and UNITED CONSULTING, an Indiana corporation ("CONSULTANT'). <br />WI TNESSETH <br />WHEREAS, the CONSULTANT did, on April 26, 2016 enter into an Agreement with the LOCAL PUBLIC <br />AGENCY for Engineering Services and Documents in relation to the following described project: <br />Des. No, 1401810 <br />Coal Line Trail, Phase I; from Lincoinway West to <br />Riverside Drive in LaPorte District <br />This supplement is required to add the following new services to the original scope of work: <br />Phase II Environmental Site Assessment and Appraisal Problem Analysis (APA) <br />WHEREAS, in order to provide for completion of the work it is necessary to amend and supplement the <br />Engineering Agreement. <br />NOW, THEREFORE, it is agreed by and between the parties as follows: <br />L Appendix "A nis amended to read as follows: <br />E.6. PHASE II ENVIRONMENTAL SITE ASSESSMENT <br />The CONSULTANT shall complete a limited Phase II Environmental Site Assessment along <br />the Coal Line Trail. The proposed locations and spacing of the borings are based on the <br />results of the Phase I Environmental Site Assessment. <br />The CONSULTANT shall complete a total of 14 soil borings to characterize the soils at the <br />identified locations. The borings shall be advanced to depths ranging from five to eight <br />feet below the existing ground surface. Soil samples shall be collected on a continuous <br />basis at approximate 2-foot intervals throughout the depth of each boring. Each recovered <br />soil sample shall be classified and screened in the field for the presence of volatile organic <br />vapors using a portable photoionization detector (PID) and visually evaluated for obvious <br />visible indications of potential impacts. A total of 24 soil samples shall be submitted for <br />analysis. <br />Supplemental Agreement version 6-2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.