My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - Abonmarche Consultants Inc - Back Water Valve Installations
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Professional Services Agreement - Abonmarche Consultants Inc - Back Water Valve Installations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 1:58:42 PM
Creation date
2/12/2019 4:09:52 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
2/12/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ENGINEERS JOINT CONTRACT <br />DOCUMENTS COMMITTEE <br />AGREEMENT <br />BETWEEN OWNER AND ENGINEER <br />FOR <br />PROFESSIONAL SERVICES <br />THIS IS AN AGREEMENT effective as of February 12.2019 ("Effective Date") between <br />Board of 1'tl lie Works City ofSoutli B lid, Indiana ("Owner") and <br />Aborrirnarche Consultants, Inc. ("Engineer"). <br />Owner's Project, of which Engineer's services under this Agreement are a part, is generally identified as <br />follows: <br />St. Jose )h River Backwater Valves - CityPr9ject No. 119-01f1("Project"). <br />Engineer's Services under this Agreement are generally identified as follows: <br />Desi !n construction documents bidding -and construction administration for three backwaters <br />gates on storm sewer outlets in St. Joseph River between Michigan Street and Ailgela,. Boulevard. <br />Owner and Engineer further agree as follows: <br />1.01 Basic Agreement and Period of Service <br />A. Engineer shall provide, or cause to be provided, the services set forth in this Agreement. If <br />authorized by Owner, or if required because of changes in the Project, Engineer shall furnish <br />services in addition to those set forth above. Owner shall pay Engineer for its services as set forth in <br />Paragraphs 7.01 and 7.02. <br />B. Engineer shall complete its services within a reasonable time, or within the following specific time <br />period: <br />1. Preliminary Plans within 6 weeks of authorization. <br />2. Permits to be submitted within 4 weeks of authorization <br />3. Final Plans within 3 weeks after review of Preliminary Plans with City. <br />Page 1 <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.