Laserfiche WebLink
TM AIADocument G 1 2017 <br />Change Order <br />PROJECT: (Name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: <br />17043 - Erskine Clubhouse Renovation Contract For: General Construction Change Order Number: 08 <br />City Project #236563 Date: 8/28/2018 Date: 2/4/2019 <br />OWNER: (Name and address) <br />ARCHITECT: (Name and address) <br />CONTRACTOR: (Name and address) <br />Board of Public Works <br />Gregory A. Kil & Associates, Inc. <br />Ziolkowski Construction Co., Inc. <br />City of South Bend, IN <br />1316 County City Building <br />(d/b/a) Kil Architecture / Planning <br />4050 Ralph Jones Drive <br />227 W Jefferson Boulevard <br />1126 Lincolnway East <br />South Bend, IN 46628 <br />South Bend, IN 466011830 <br />South Bend, IN 46601 <br />THE CONTRACT IS CHANGED AS FOLLOWS: <br />(Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments <br />attributable to executed Construction Change Directives.) <br />Per the attached RCO #022, add $760.00 to modify two (2) exhaust fans and associated ductwork per RFI4038. <br />Per the attached RCO #023, add $8,310.00 to provide labor, material and equipment to install IT/Data. <br />Per the attached RCO #024, no change in cost to revise the lighting on the lower level. <br />Per the attached RCO #027, add $3,062.00 to provide labor, material and equipment to remove unforeseen plaster ceiling, suspened ceiling <br />tile and grid location on the ground floor level per RFi 002. <br />Per the attached RCO #028, add $460.00 to provide labor and material to install R-13 foil faced insulation in west gable end wall per RFI <br />037. <br />Per the attached RCO # 029, add $11,272.00 to provide labor, material and equipment to remove stone for two (2) new openings per <br />referenced drawings. Base price is to use Tublite 14000 series Kynar White fixed windows. Glass to be 1" clear insulated withmuttons. <br />The original Contract Sum was $ 907 000.00 <br />The net change by previously authorized Change Orders $ 83,126.00 <br />The Contract Sum prior to this Change Order was $ 990,126.00 <br />The Contract Sum will be increased by this Change Order in the amount of $ 23,864.00 <br />The new Contract Sum including this Change Order will be $ 1,013,990.00 <br />The Contract Time will be increased by Zero (0) days. <br />The new date of Substantial Completion will be March 22, 2019 <br />NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract <br />Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the <br />Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. <br />NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. <br />Gregory A. Kil & Associates, Inc. Ziolkowski Construction, Inc <br />A ITE w t rDm1r/tca d CONTRACTOR (Firm name) <br />SI T&C <br />SIGNATURE <br />t AAArchitectCr, <br />(.m Ma r <br />PR T AND TITLE PRINTED NAME AND TITLE <br />Z-S•t <br />DATE DATE <br />Board of Public Works, City of South <br />Bend, IN <br />OWNER (k-h ru:arDr <br />Of Pawic W46 <br />SIGNATURE t, CEB <br />�Ya <br />DATE <br />AIATM : T <br />yIUA Document t n70mu.m, k 201t7a U pyrightmll 91791119w71r2000 , 2001 and 2017 by The Americanµ Institute reserved. tD .^ Instit a of Au"c 1te A hts <br />ll o.u� W U. t y .V y Copyright t -a a at�a�aiu��"a¢tio nail tmmaWes, U nauthou'liz�ed ireproductuon oir iNstulbumbon �af this MAII Document, 11r <br />any Iiummu°U`ion of it., may resuullt in seveum: a;lia i and ciriiurrutiiaaall penaffiea, and wilill The prosercuted to the uamaaxlirnuuumu extent 14masssill;ulle under the Ilaw, This <br />document was produced by ALA software at 14:10:07 ET on 02104/2019 under Order No, 4725810215 which expires on 02/04/2020, and is not for resale, <br />User Notes: <br />