My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 8 - Erskine Clubhouse Renovation Project No 116-108 - Ziolkowski Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 8 - Erskine Clubhouse Renovation Project No 116-108 - Ziolkowski Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 1:01:31 PM
Creation date
2/12/2019 3:58:09 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/12/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2021 N Merrifield <br />Mishawaka, IN 46545 <br />Fax (574) 855-3592 <br />Cell (574) 334-0259 <br />Quote #C10569-4 <br />Ziolkowski Construction <br />4050 Ralph Jones Drive <br />South Bend, Indiana 46628 <br />Attn: Tim Morey <br />January 2, 2018 <br />Erskine Golf Course Club House- Lighting Changes <br />Scopg of Work- Lighting Chan gg �t �lra chard on the devils fisted below <br />Revise the lighting on the lower level per the attached sketch based on the below <br />clarifications. <br />o Track Lighting, change feed ends to eliminate the Current Limiters per track <br />run and change to a standard type track feed end. We checked our lighting <br />rep and he confirmed these are not needed and will not affect the operation of <br />the lighting. <br />o Change lighting layout, amount of feeds because of the changes in lay out per <br />attached sketch that was provided <br />o Utilize MC Cable were ever possible on the project. <br />Price- N/C <br />Not to Exceed <br />$00.00 <br />(Sales tax excluded) <br />Terms and Conditions <br />Warranties <br />- Engineering — Elite Electric will guarantee its engineering from defects for a period of one year, <br />- Hardware — Manufacturer's warranties will apply to all equipment covered in this proposal. <br />- Warranty Exclusions — Elite Electric will not replace or warrant damage due to negligence, vandalism or acts <br />of God <br />Limits of Proposal <br />Proposal considers the existence of system drawings to indicate current accurate configuration. <br />This proposal considers work being done during normal working hours. O/T is not covered by this proposal. <br />Delays by others are not considered by this proposal. <br />This proposal does not consider the failure of existing hardware devices retained for reuse. <br />Utility Costs of any sort are excluded from this proposal <br />Cutting, patching, painting is not included in this proposal. <br />Security, Speakers, not included in this proposal <br />State Drawings, not included in this proposal <br />CAD drawings not included in this proposal <br />Elite Electric Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.