My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 8 - Erskine Clubhouse Renovation Project No 116-108 - Ziolkowski Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 8 - Erskine Clubhouse Renovation Project No 116-108 - Ziolkowski Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 1:01:31 PM
Creation date
2/12/2019 3:58:09 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/12/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ziolkowski Construction <br />4050 Ralph Jones Drive <br />South Bend, Indiana 46628 <br />Attn: Tim Morey <br />2021 N Merrifield <br />Mishawaka, IN 46545 <br />Fax (574) 855-3592 <br />Cell (574) 334-0259 <br />Quote #C10569-3 <br />January 4, 2018 <br />ErsIdne Golf Course Club House -IT conduit and wire adder <br />Scope of Worle- IT Addet, <br />0 Install I/" emt conduit or flexible metallic conduit depending on the situation, from <br />each IT device location back to the IT Rack location:. <br />Price assumes combining Cat 6 cabling in the %" conduit on the home runs back to <br />the rack per each floor as we are able to do. <br />o Price includes pulling 1- Cat 6 cable to each location identified. <br />0 Terminations on both ends will be by others. <br />If a drop comes down an exposed wall in a public area we can run the drop in wire <br />mold if die owner would like. <br />e Labor 70 hours @ 70.00 = $4,900.00 <br />Material $1,900.00 <br />O/H & Profit 10% $680.00 <br />Price -Deduct <br />Not to Exceed <br />$ 7,480.00 <br />(Sales tax excluded) <br />� "� Conditions <br />Warranties <br />- Engineering — Elite Electric will guarantee its engineering from defects for a period of one year. <br />- Hardware — Manufacturer's warranties will apply to all equipment covered in this proposal. <br />- Warranty Exclusions — Elite Electric will not replace or warrant damage due to negligence, vandalism or acts <br />of God <br />Limits ofProposal <br />- Proposal considers the existence of system drawings to indicate current accurate configuration. <br />- This proposal considers work being done during normal working hours. O/T is not covered by this proposal. <br />- Delays by others are not considered by this proposal. <br />- This proposal does not consider the failure of existing hardware devices retained for reuse. <br />- Utility Costs of any sort are excluded from this proposal <br />Elite Eleehtc <br />Page r of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.