Laserfiche WebLink
10.1. Redesign or relocation of park elements as shown on the approved concept plan. <br />10.2. Construction inspection and engineering. <br />10.3. <br />Subsurface utility engineering. <br />10.4. <br />Stream and wetland mitigation. <br />10.5. <br />Additional document submittals. <br />10.6. Right of way acquisition services. <br />10.7. Right of way staking. <br />10.8. Individual IDEM Section 401 Water Quality Certification <br />10.9. Individual Section 404 Department of the Army Corps of Engineers Permit. <br />10.10. Providing any type of property surveys and staking to enable contractor(s) to proceed with <br />their work; and providing other special field surveys. <br />10.11. SWCD and MS4 review fees. <br />b. Refer to Exhibit C 1 and modify A, 1 by adding item: <br />b. Phase 1 Design and Engineering $253,217.00 <br />For the Additional Services or the modifications to services set forth above, Owner shall Pay Engineer <br />the following additional or modified compensation: <br />a. <br />Topographic Survey Data Collection <br />Lump Sum <br />$30,800.00 <br />Park Engineering and Design <br />Lump Sum <br />$85,000.00 <br />Electrical <br />Lump Sum <br />$22,500.00 <br />Plumbing and Sewer Design <br />Lump Sum <br />............. <br />$13,738.00 <br />Structural Design <br />_... <br />......................................... <br />Lump Sum <br />.... _............. ..._.._.._. <br />$24,300.00 <br />......... ....................... <br />IDNR Floodway Permit <br />........................ <br />...................................... <br />Lump Sum <br />$14,000.00 <br />Rule 5 Permit Application & SWPPP <br />____,_ ................................- <br />Lump Sum <br />$4,800.00 <br />401/404 Waterway Permits <br />Lump Sum <br />$8,037.00 <br />.............................. ....................................... <br />Utility Coordination <br />.................................. <br />............................................. ..._.� .� <br />Hourly Rate, Not to <br />$3,100.00 <br />Exceed <br />Geotechnical Investigation _ <br />Unit Rate, Not to Exceed <br />$11,580.00 <br />uITITITITITITITITITITITITIT <br />Bid Phase & Construction PhaseOffice mmmmmmmmmmWmmmmmmm <br />Services <br />ITITIT-mITITITIT ITITITITITITITITITITITIT <br />----- <br />Hourly Rate, Not to <br />$22,000.00 <br />Exceed <br />................................................. _ _..�.� <br />Subtotal Not To Exceed Fee <br />$239,855.00 <br />........ ...... ...................................� <br />Cultural Resources Survey, If Required (404 Permit) <br />Hourly, Not to Exceed <br />$10,482.00 <br />..................................................... .................... ._. <br />Archaeological Investigation, If Required (404 <br />........... ......_..... ._._...... ._.._... <br />�.......�. <br />Lump Sum <br />$2,880.00 <br />Permit) <br />Total Not to Exceed Fee <br />$253,217.00 <br />Page 8 <br />(Exhibit K - Amendment to Owner -Engineer Agreement) - Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />