My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to PSA - Lochmueller Group Inc - Services for Leeper Park Improvements Project
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Amendment No 1 to PSA - Lochmueller Group Inc - Services for Leeper Park Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 1:18:54 PM
Creation date
2/12/2019 3:50:39 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
2/12/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5.3. The CONSULTANT shall prepare utility plans including plans for electrical and plumbing <br />site utilities required for the Studebaker Fountain (internal plumbing, electrical, and <br />mechanical design by others), storm/sanitary sewer alterations, and site lighting. <br />5.4. The CONSULTANT shall prepare a Maintenance of Traffic plan for the project. Key <br />considerations will be maintaining traffic along State routes. Maintenance of traffic plans <br />will be designed in accordance with the IMUTCD. <br />5.5. The CONSULTANT shall prepare water/wastewater plans, details, and specifications <br />associated with drinking water (water service to the proposed fountain) and stormwater <br />systems (existing stormwater system relocation). Design services include: <br />5.5.1. Review of existing construction plans and information that may be available. <br />5.5.2. Performing process and hydraulic calculations to confirm the size of the water <br />piping associated with the fountain improvements. <br />5.5.3. Plan and Profile view layouts for water piping and stormwater system <br />improvements included in the project. <br />5.5.4. Detail Sheets. <br />5.6. The CONSULTANT shall prepare structural design plans, details, and specifications for: <br />5.6.1. Studebaker Fountain foundation <br />5.6.2. River Overlook <br />5.7. The CONSULTANT shall prepare electrical design plans, details, and specifications for: <br />5.7.1. Power to the Studebaker Fountain <br />5.7.2. Park lighting along the central avenue, main paths and playground <br />5.7.3. Low level lighting for the overlook <br />5.8. The CONSULTANT shall prepare updated opinions of probable cost at each design <br />submission. <br />5.9. The CONSULTANT shall, in association with the City of South Bend, prepare <br />documents required for the public bid of the project. <br />Task 6.PERMITS: <br />6.1. The CONSULTANT shall prepare one Indiana Department of Natural Resources (IDNR) <br />Construction in a Floodway Permit Application. The tasks to be performed shall include <br />the following: <br />6.1.1. Project Organization — This includes the management of the permitting tasks to <br />keep the project on schedule and on budget. <br />6.1.2. IDNR Construction in a Floodway Permit - This includes the completion of the <br />IDNR Construction in a Floodway Permit Application including all public <br />notice requirements. This task does not include any hydraulic modeling and <br />assumes the project will meet one of the IDNR Non -Modeling Worksheet <br />requirements. This task does include a floodway cross sectional analysis using <br />the base flood elevation from the IDNR Floodplain Information Portal to <br />confirm the project will fall under the Non -Modeling Worksheet criteria or <br />Page 4 <br />(Exhibit K - Amendment to Owner -Engineer Agreement) - Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.