Laserfiche WebLink
..1917. <br />Board met in -special session at 7: 30 P.M. Mr. A. H. Rico absent. <br />:ity Attorney h. F, Seebirt and City Engineer F. J. Anderson present. <br />Hearing on the q t ion of track elevation was taken up, this being. <br />the 4'ate and time set for a hearing on Plans, t spec if icRt ions and estimated cost under <br />Modifieat R od t o he aration.of Grades of the New York Central Railway <br />Company . C RC r e $ t on was read, plans were exhibited and, the estimatd <br />costs read, both those prepared ,by the .City •and .companies concerned. <br />I The representatives of.the various companies affected were present <br />as well as other citizens, a pub 1 is .discuss ion , was >had and the Board after hearing <br />the evidence and. the open discuss ion, decided to continue the hearing for six montha <br />from state. By Resolution of the Board the hearing and all matters connected therewith <br />is hereby continued. until -the .20th. -day of -May 1918 at 7:.30 P.U. <br />( The rollowing persons were present at said hearing. Mr..A. S. Floing <br />Engineer for the Gredn Trunk Western Ry. Co., Attorney W. G. Grabill, Attorney Samuel <br />Parker, Judge Van Fleet, A6rne'y Hubbell, Mr., Currier Engineerof tht the New York <br />Central Ry. Co..and. Ur. gal,, .Gen',j .Ugr. of the New York Central Ry,. Company. <br />Mr. CAris. Fassnacht representing the Indiana Lbr. Co., Fudge Hammersahmidt, Mr. Freeman <br />representing Oliver Chilled Plow Works,,..Hildebr4nd..), <br />November 19,1917. <br />The Qrab1e-Beard of Public Works, <br />South Bend, Indiana. <br />Gentlemen: <br />The 'Plans and estimates filed' by the Engineering Departmeht in connections <br />with grade Separation of Bronson, ldichigan, Main, Scott and Chapin Street* , and at <br />Lafayette Blvd. and Prairie Avenue, are based cn the proposed layout submitted by the <br />v New York Central for at least six track* at all of these street crossings. <br />The propaeed rearrangement oP 'backs does not materially affect the City's <br />share of the cost ,at any of tole crossings except that of Bronson St., <br />I am attaching an &ppr'oxiiite 'estlniate 'of the cost of the work at Bronson <br />St.,, based on ,the .raeaent three track layout, which you will notice is about 4,330,- D0 <br />less than that filed with the grade separation estimate. <br />Respectfully submitted, <br />„ Frederick J. Anderson, <br />City Civil Engineer. <br />. BRONSOX STREET. <br />ESTIMATE OF WORK TO BE ,DONE BY THE �GITY OF SOUTH BEND, INDIANA. <br />WITH PRESENT THREE .(3) .TRACKS ELE vATED. <br />Excavat ion <br />3357 cu. <br />yds. at .75 per cu. yd. <br />29517.75 <br />Curb and gutter <br />1150 tin. <br />ft. at_.60 per lin. ft. <br />690.00 <br />Cement walk <br />3840 sq. <br />ft. at .15 per sq. ft.. <br />556.Oa <br />Pavement <br />1700 sq. <br />yds, at 2.50 per sq. yd. <br />49250.00 <br />Squafie inlets. <br />2 at 15.00 each. <br />30.00 <br />8 Inch pipe <br />50 lin. <br />ft. at . 80 -per lin ft. <br />40.00 <br />12 inch pipe sewer. . , • .. • . •150-tin <br />-fti 'at °1.50 per lin ft. <br />195.00 <br />Manhole <br />°°°. 7 lineal feet at S:tg per ft. <br />35.00 <br />Lowering water mains and services <br />992,775 <br />`9.243.50 <br />Engineering and <br />contingencies _ 10% , <br />926.50 <br />19,17Q.00 <br />' Uinutes of special <br />session held Thursday November <br />15th.,1917 read <br />and oppreved. <br />r <br />President. <br />